Communities Fighting New Overhead ATCO Transmission Line
• September 19, 2016 • Comments Off on Communities Fighting New Overhead ATCO Transmission LinePosted in Uncategorized
Tags: aboriginal, Alberta Electric System Operator, Alberta PC Government, Alberta Powerline, Alberta Utilities Commission, ATCO, Bury high voltage lines, electricity export, electromagnetic fields, Environment, Fort McMurray West 500 kV Transmission Project, Health, negative overhead power line impacts, Property Values, visual impacts
Overhead Power Lines Linked “Beyond Reasonable Doubt” to Childhood and Adult Leukemia
• February 24, 2014 • Comments Off on Overhead Power Lines Linked “Beyond Reasonable Doubt” to Childhood and Adult LeukemiaPosted in bury power lines, Corona Effect, Electromagnetic Fields, Health Impacts
Tags: Alzheimer's disease, asthma, Bury high voltage lines, corona effect, Dr. Denis Henshaw, electromagnetic fields, Ireland, leukemia, lung cancer, miscarriage, power line health impacts
Pressure Builds in U.S. to Bury High Voltage Power Lines
• January 17, 2014 • Comments Off on Pressure Builds in U.S. to Bury High Voltage Power LinesPosted in bury power lines, Burying High Voltage Lines, Northern Pass Project, Visual Impacts
Tags: Bury high voltage lines, bury power lines, ComEd, Grand Prairie Gateway Project, Jeb Bradley, Kane County, Northeast Utilities, Northern Pass Project, power line visual impacts, Public Service of New Hampshire, ugly, underground power lines
Concern in Ireland about Overhead High Voltage Power Lines
• January 14, 2014 • Comments Off on Concern in Ireland about Overhead High Voltage Power LinesPosted in bury power lines, Burying High Voltage Lines
Tags: Bury high voltage lines, bury power lines, Eirgrid, Environment, Grid Link Action Group, Health, Ireland, negative power line impacts, noise, Property Values, Roscommon and Mayo Protection, underground power lines, visual
AltaLink Transmission Line Kills Birds
• January 8, 2014 • Comments Off on AltaLink Transmission Line Kills BirdsPosted in AltaLink, Bird Deaths, bury power lines, Environmental Impacts, Heartland Transmission Project, SNC-Lavalin
Tags: AltaLink, Bury high voltage lines, bury power lines, David McIntyre, Heartland Transmission Project, power line bird deaths, power line environmental impacts, SNC-Lavalin scandal, underground power lines
Power Outages Spur Examination of Burying Lines
• January 3, 2014 • Comments Off on Power Outages Spur Examination of Burying LinesPosted in bury power lines, Burying High Voltage Lines, ice storm, Power outages
Tags: Bury high voltage lines, bury power lines, environmental, Health, ice storm impacts on power lines, Joe Mihevc, Ontario Energy Board, power outages, Property Values, Safety, underground power lines
Power Outages Cost Millions
• December 26, 2013 • Comments Off on Power Outages Cost MillionsPosted in bury power lines, Burying High Voltage Lines, ice storm, Power outages, Safety Impacts
Tags: Bury high voltage lines, bury power lines, deaths, ice storm impacts on power lines, power line safety impacts, power outages
Ice Storm Knocks Out Power to Hundreds of Thousands of Canadians
• December 23, 2013 • Comments Off on Ice Storm Knocks Out Power to Hundreds of Thousands of CanadiansPosted in bury power lines, Burying High Voltage Lines, ice storm, Power outages
Tags: Bury high voltage lines, bury power lines, ice storm impacts on power lines, power outages, underground power lines
Overhead Power Lines Cause More Aircraft Crashes and Deaths
• December 19, 2013 • Comments Off on Overhead Power Lines Cause More Aircraft Crashes and DeathsPosted in airplane crashes, bury power lines, Burying High Voltage Lines, helicopter crashes, hot air balloons
Tags: Airplane Helicopter and Hot Air Balloon Accidents Due to Overhead Power Lines, Bury high voltage lines, bury power lines
Electricity Transmission in Alberta Ignores the Public Interest
• October 17, 2013 • Comments Off on Electricity Transmission in Alberta Ignores the Public InterestPosted in Alberta Utilities Commission, AltaLink, bury power lines, Public Consultation
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Jayne Parsons, Jim Law, Mick Parsons, negative power line impacts, public consultation, public interest
More Aircraft and Hot Air Balloons Crash into Power Lines
• September 23, 2013 • Comments Off on More Aircraft and Hot Air Balloons Crash into Power LinesPosted in Aircraft Impacts, bury power lines, Burying High Voltage Lines
Tags: Airplane Helicopter and Hot Air Balloon Accidents Due to Overhead Power Lines, Bury high voltage lines, bury power lines, power line aircraft impacts
AUC Power Line Hearings Intimidating and Unfair to Residents
• September 20, 2013 • Comments Off on AUC Power Line Hearings Intimidating and Unfair to ResidentsPosted in Alberta Electric System Operator, Alberta Utilities Commission, AltaLink, bury power lines
Tags: Alberta Electric System Operator, Alberta PC Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, intimidate, Medicine Hat, negative power line impacts
AltaLink Continues to Ignore Facts about Power Line Impacts
• September 11, 2013 • Comments Off on AltaLink Continues to Ignore Facts about Power Line ImpactsPosted in Alberta Utilities Commission, AltaLink, bury power lines, Electromagnetic Fields, Health Impacts, SNC-Lavalin
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, negative power line impacts, power line electromagnetic fields, power line health impacts, SNC-Lavalin scandal, underground power lines
Chino Hills Gets Power Line Buried
• July 22, 2013 • Comments Off on Chino Hills Gets Power Line BuriedPosted in bury power lines, Burying High Voltage Lines, Chino Hills, Hope For The Hills, Southern California Edison, Tehachapi Renewable Transmission Project, underground power lines
Tags: Bury high voltage lines, bury power lines, Chino Hills, Hope For The Hills, negative power line impacts, public interest, Southern California Edison, underground power lines
Calls to Bury Power Lines Following February 2013 Nor’easter Storm
• February 14, 2013 • Comments Off on Calls to Bury Power Lines Following February 2013 Nor’easter StormPosted in bury power lines, Burying High Voltage Lines, Power outages, underground power lines
Tags: Bury high voltage lines, bury power lines, negative power line impacts, power outages, underground power lines
What Happened to Edmonton’s Innovative Approach to Burying Power Lines?
• February 12, 2013 • Comments Off on What Happened to Edmonton’s Innovative Approach to Burying Power Lines?Posted in bury power lines, Burying High Voltage Lines, Edmonton (City of), EPCOR, Heartland Transmission Project, Strathcona County, Sturgeon County, underground power lines
Tags: Bury high voltage lines, bury power lines, EPCOR, underground power lines
Happy New Year
• January 1, 2013 • Comments Off on Happy New YearPosted in bury power lines, Burying High Voltage Lines, Cartoon, underground power lines
Tags: Bury high voltage lines, bury power lines, underground power lines
Customers Willing to Pay to Get Transmission Lines Buried
• December 26, 2012 • Comments Off on Customers Willing to Pay to Get Transmission Lines BuriedPosted in Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, National Grid, No Moor Pylons, Public Opinion Survey
Tags: Bury high voltage lines, bury power lines, Leger Marketing, Paul Hipwell
Underground Transmission Conference
• December 22, 2012 • Comments Off on Underground Transmission ConferencePosted in bury power lines, Burying High Voltage Lines, underground power lines
Tags: Bury high voltage lines, bury power lines, negative power line impacts, underground power lines
No Need for School to Close if Heartland Line was Buried
• December 10, 2012 • Comments Off on No Need for School to Close if Heartland Line was BuriedPosted in Alberta P.C. Party, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Heartland Transmission Project, John Kristensen, underground power lines, Western Alberta Transmission Line
Tags: Bury high voltage lines, bury power lines, Colchester School closing, Heartland Transmission Project, public interest, underground power lines
Everyone is Questioning Overhead High Voltage Lines
• December 9, 2012 • Comments Off on Everyone is Questioning Overhead High Voltage LinesPosted in American Transmission Company, APS, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, Idaho Power, Rocky Mountain Power, Southern California Edison, underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, Jurupa Valley, underground power lines, Wauwatosa
Illinois Residents Upset with Proposed 345kV Power Line
• November 23, 2012 • Comments Off on Illinois Residents Upset with Proposed 345kV Power LinePosted in Agricultural Impacts, Ameren Transmission Company, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Health Impacts, Livestock Impacts, Stop the Power Lines Coalition, underground power lines
Tags: Bury high voltage lines, bury power lines, power line agriculture impacts, power line health impacts, power line livestock impacts, underground power lines
Power Lines and Airplane, Helicopter and Hot Air Balloon Accidents
• November 20, 2012 • Comments Off on Power Lines and Airplane, Helicopter and Hot Air Balloon AccidentsPosted in Aircraft Impacts, airplane crashes, bury power lines, Burying High Voltage Lines, helicopter crashes, hot air balloons, underground power lines
Tags: airplane crashes, Bury high voltage lines, bury power lines, deaths, helicopter crash, hot air balloons crash, power line aircraft impacts, underground power lines
Terrorists Could Attack Power Grids
• November 15, 2012 • Comments Off on Terrorists Could Attack Power GridsPosted in bury power lines, Burying High Voltage Lines, Health Impacts, Operation Circuit Breaker, Property Value Impacts, terrorism, underground power lines
Tags: Bury high voltage lines, bury power lines, Department of Homeland Security, National Academy of Sciences, terrorism, underground power lines
No Health Dangers with Underground Lines
• November 15, 2012 • Comments Off on No Health Dangers with Underground LinesPosted in bury power lines, Burying High Voltage Lines, Corona Effect, Electromagnetic Fields, Health Impacts, underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, Don MacIvor, Duffin Wind Power, power line health impacts, underground power lines
Calls to Bury Power Lines Increase
• November 7, 2012 • Comments Off on Calls to Bury Power Lines IncreasePosted in AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, Power outages, underground power lines
Tags: AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, power outages, Superstorm Sandy, underground power lines
Properties Devalued by Overhead Power Lines
• November 5, 2012 • Comments Off on Properties Devalued by Overhead Power LinesPosted in bury power lines, Burying High Voltage Lines, Northern Pass Project, Property Value Impacts, underground power lines
Tags: Andrew Smith, Bury high voltage lines, bury power lines, Northern Pass Project, Peter Powell, power line property value impacts, underground power lines
Overhead High Voltage Lines Lower Property Values
• November 2, 2012 • Comments Off on Overhead High Voltage Lines Lower Property ValuesPosted in bury power lines, Burying High Voltage Lines, Northern Pass Project, Property Value Impacts, underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, Northeast Utilities, Northern Pass Project, Northern Pass Transmission LLC, NSTAR, power line property value impacts, power line visual impacts, underground power lines
Superstorm Sandy Knocks out Power Lines
• October 31, 2012 • Comments Off on Superstorm Sandy Knocks out Power LinesPosted in bury power lines, Burying High Voltage Lines, Hurricane, Power outages, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, hurricane impacts on power lines, power line safety impacts, power outages, Superstorm Sandy, underground power lines
Six Million Without Power So Far
• October 30, 2012 • Comments Off on Six Million Without Power So FarPosted in bury power lines, Burying High Voltage Lines, Hurricane, Power outages, underground power lines
Tags: Bury high voltage lines, bury power lines, hurricane impacts on power lines, power outages, Superstorm Sandy, underground power lines
Solar Storm Threat to Overhead Power Lines
• October 23, 2012 • Comments Off on Solar Storm Threat to Overhead Power LinesPosted in bury power lines, Burying High Voltage Lines, Power outages, Solar Storm, underground power lines
Tags: Bury high voltage lines, bury power lines, electromagnetic pulses, geomagnetic disturbances, geomagnetically induced electric currents, power outages, solar storm impacts on power lines, underground power lines
Overhead Power Lines Result in Power Outages
• September 2, 2012 • Comments Off on Overhead Power Lines Result in Power OutagesPosted in bury power lines, Burying High Voltage Lines, Health Impacts, Hurricane, Power outages, Property Value Impacts, Tornado, Tourism Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, hurricane impacts on power lines, Hurricane Isaac, power line health impacts, power line property value impacts, power line tourism impacts, power outages, tornado impacts on power lines, underground power lines
New Schools Open While Colchester School Will Close
• August 28, 2012 • Comments Off on New Schools Open While Colchester School Will ClosePosted in Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alison Redford, AltaLink, Athabasca-Sturgeon-Redwater constituency, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Ed Stelmach, Edmonton Greenbelt, Elk Island Public Schools, EPCOR, Health Impacts, Heartland Transmission Project, Jeff Johnson, Safety Impacts, Sherwood Park Greenbelt, SNC-Lavalin, Strathcona County, Sturgeon County, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, Alison Redford, AltaLink, Athabasca-Sturgeon-Redwater constituency, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, Edmonton Greenbelt, Elk Island Public Schools, EPCOR, Heartland Transmission Project, Jeff Johnson, power line health impacts, power line safety impacts, Sherwood Park Greenbelt, SNC-Lavalin, Strathcona County, Sturgeon County, underground power lines
High Costs of Maintaining Overhead Power Lines
• August 26, 2012 • Comments Off on High Costs of Maintaining Overhead Power LinesPosted in Aircraft Impacts, AltaLink, bury power lines, Burying High Voltage Lines, Property Value Impacts, Tourism Impacts, underground power lines
Tags: AltaLink, Bury high voltage lines, bury power lines, helicopter hazard, power line aircraft impacts, power line maintenance costs, power line property value impacts, power line tourism impacts, underground power lines
Upset about the Heartland Power Line?
• August 19, 2012 • Comments Off on Upset about the Heartland Power Line?Posted in Alberta Electric System Operator, Alberta Energy, Alberta Government, Alberta NDP, Alberta P.C. Party, Alberta Utilities Commission, Alison Redford, AltaLink, Bill 19, Bill 50, Bird Deaths, bury power lines, Burying High Voltage Lines, Cathy Olesen, Court of Appeal, Dave Quest, Deron Bilous, Eastern Alberta Transmission Line, Edmonton Greenbelt, Environmental Impacts, EPCOR, Gene Zwozdesky, Heartland Transmission Project, Jeff Johnson, Karen Shaw, Ken Hughes, Naresh Bhardwaj, Peter Sandhu, Property Rights, Proximity, Public Consultation, Sherwood Park Greenbelt, SNC-Lavalin, Stantec Consulting Ltd., Sturgeon County, underground power lines, Western Alberta Transmission Line
Tags: Alberta Court of Appeal, Alberta Electric System Operator, Alberta Energy, Alberta Government, Alberta NDP, Alberta PC Party, Alberta Utilities Commission, Alberta's Industrial Heartland, Alison Redford, Alison Redford political interference, AltaLink, Bill 19, Bill 50, Bury high voltage lines, bury power lines, Cathy Olesen, Dave Quest, Deron Bilous, Eastern Alberta Transmission Line, Edmonton Greenbelt, environmental impact assessment, EPCOR, Gene Zwozdesky, Heartland Transmission Project, Jeff Johnson, judicial review, Karen Shaw, Ken Hughes, lattice transmission towers, lawsuits, Making Money by Making Friends: SNC-Lavalin/AltaLink, Naresh Bhardwaj, Peter Sandhu, power line bird deaths, power line environmental impacts, private property rights, public consultation, Sherwood Park Greenbelt, SNC-Lavalin, Stantec Consulting Ltd., Sturgeon County, Transportation Utility Corridor, underground power lines, Western Alberta Transmission Line
Sabotage of Overhead High Voltage Power Lines
• August 7, 2012 • Comments Off on Sabotage of Overhead High Voltage Power LinesPosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Calgary Police Service, CSIS, David Omick, Edmonton Police Service, Electricity: Coal-fired, electricity: hydro, fuel cell, Heartland Transmission Project, high voltage power line sabotage, Operation Circuit Breaker, RCMP, Sherwood Park, Solar energy, underground power lines, Wind energy
Tags: 9/11, Alberta Utilities Commission, Bury high voltage lines, bury power lines, Calgary Police Service, Coal-fired electricity, counter-terrorism unit, CSIS, David Omick, Edmonton Police Service, fuel cell, Heartland Transmission Project, high voltage power line sabotage, hydro-electricity, negative power line impacts, Operation Circuit Breaker, RCMP, Sherwood Park Greenbelt, solar energy, terrorism, underground power lines, wind energy
Nobody Wants Overhead High Voltage Power Lines
• August 3, 2012 • Comments Off on Nobody Wants Overhead High Voltage Power LinesPosted in Aesthetic Impacts, Agricultural Impacts, Aircraft Impacts, Bureau of Land Management, bury power lines, Burying High Voltage Lines, Butte-Silver Bow, Development Impacts, Environmental Impacts, Health Impacts, Livestock Impacts, Montana Dept Environmental Quality, Mountain States Transmission Intertie, National Grid, NorthWestern Energy, Pipeline Impacts, Power outages, Property Value Impacts, Safety Impacts, Tourism Impacts, underground power lines, Visual Impacts
Tags: Bureau of Land Management, Bury high voltage lines, bury power lines, Butte-Silver Bow, Montana Department of Environmental Quality, Mountain States Transmission Intertie, National Grid, negative power line impacts, NorthWestern Energy, power line aesthetic impacts, power line agriculture impacts, power line aircraft impacts, power line development impacts, power line environmental impacts, power line health impacts, power line livestock impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line tourism impacts, power line visual impacts, power outages, underground power lines
If You Don’t Like EPCOR’s High Power Prices…Switch
• August 2, 2012 • Comments Off on If You Don’t Like EPCOR’s High Power Prices…SwitchPosted in Adagio, AltaLink, Bow Valley, Brighter Futures, bury power lines, Burying High Voltage Lines, E.NRG, Edmonton (City of), Electricity Costs, EPCOR, Heartland Transmission Project, Milner, Mountain View, regulated rate option, SNC-Lavalin, Spark, Spot Power, Strathcona County, Sturgeon County, underground power lines, Utility Network & Partners Inc, Vector
Tags: Adagio, AltaLink, Bow Valley, Brighter Futures, Bury high voltage lines, bury power lines, E.NRG, electricity costs, EPCOR, Heartland Transmission Project, Milner, Mountain View, negative power line impacts, regulated rate option, SNC-Lavalin, Spark, Spot Power, underground power lines, Utility Network & Partners Inc, Vector
Tornadoes and Power Lines
• July 31, 2012 • Comments Off on Tornadoes and Power LinesPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Edmonton (City of), Edmonton Greenbelt, EPCOR, Heartland Transmission Project, ice storm, Power outages, Safety Impacts, Tornado, TransAlta, underground power lines, Western Alberta Transmission Line
Tags: Alberta Utilities Commission, AltaLink, Black Friday, Bury high voltage lines, bury power lines, Edmonton Greenbelt, EPCOR, Gleniffer Lake, Heartland Transmission Project, ice storm impacts on power lines, negative power line impacts, power line safety impacts, power outages, tornado impacts on power lines, Transalta, underground power lines, Western Alberta Transmission Line
Opposition to AltaLink’s Western Alberta Transmission Line Continues
• July 16, 2012 • Comments Off on Opposition to AltaLink’s Western Alberta Transmission Line ContinuesPosted in AEUB spying scandal, Agricultural Impacts, Alberta Electric System Operator, Alberta Energy & Utilities Board, Alberta Government, Alberta Landowners Council, Alberta P.C. Party, Alberta Utilities Commission, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Colleen Boddez, Court of Appeal, Energy Resources Conservation Board, Environmental Impacts, Gary Edward, Grant Budgeon, Heartland Transmission Project, Judicial Review, Proximity, Socio-economic Impacts, underground power lines, Western Alberta Transmission Line
Tags: AEUB spying scandal, Alberta Court of Appeal, Alberta Electric System Operator, Alberta Energy & Utilities Board, Alberta Government, Alberta Landowners Council, Alberta PC Party, Alberta Utilities Commission, AltaLink, Bill 50, Bury high voltage lines, bury power lines, Colleen Boddez, Energy Resources Conservation Board, Gary Edward, Grant Budgeon, Heartland Transmission Project, judicial review, negative power line impacts, power line agriculture impacts, power line environmental impacts, power line socio-economic impacts, underground power lines, Western Alberta Transmission Line
Huge Environmental Impacts of Proposed 500kV Power Lines
• July 16, 2012 • Comments Off on Huge Environmental Impacts of Proposed 500kV Power LinesPosted in Bill Dunn, Bird Deaths, Bureau of Land Management, bury power lines, Burying High Voltage Lines, Environmental Impacts, Salt River Project, Southwestern Power Group, SunZia Southwest Transmission Project, Tri-State Generation & Transmission Assoc, Tucson Electric Power Company, underground power lines, Visual Impacts, Winkelman Natural Resource Conservation District
Tags: Bill Dunn, Bureau of Land Management, Bury high voltage lines, bury power lines, power line bird deaths, power line environmental impacts, power line visual impacts, Salt River Project, San Pedro River Valley, Southwestern Power Group, SunZia Southwest Transmission Project, Tri-State Generation & Transmission Association, Tucson Electric Power Company, underground power lines, Winkelman Natural Resource Conservation District
More Proof of Power Line Impacts on Health
• July 12, 2012 • Comments Off on More Proof of Power Line Impacts on HealthPosted in bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Fact Sheets (RETA), Health Impacts, Livestock Impacts, magnetosensory cells, melatonin, underground power lines
Tags: Bury high voltage lines, bury power lines, magnetosensory cells, power line electromagnetic fields, power line health impacts, power line livestock impacts, power line melatonin impacts, power line pet impacts, underground power lines
Gold-Plating the Power Grid
• July 9, 2012 • Comments Off on Gold-Plating the Power GridPosted in Alberta Electric System Operator, Australian Energy Market Operator, bury power lines, Burying High Voltage Lines, Electricity Costs, Manning Alliance, Powerlink Queensland, Public Consultation, TransGrid, underground power lines
Tags: Alberta Electric System Operator, Australian Energy Market Operator, Bury high voltage lines, bury power lines, high electricity costs, Manning Alliance, negative power line impacts, overbuilding power lines, Powerlink Queensland, public consultation, TransGrid, underground power lines
Transmission Company Ordered to Consider Burying Power Lines
• July 8, 2012 • Comments Off on Transmission Company Ordered to Consider Burying Power LinesPosted in bury power lines, Burying High Voltage Lines, California, Chino Hills, Health Impacts, Hope For The Hills, Property Value Impacts, Safety Impacts, Southern California Edison, Tehachapi Renewable Transmission Project, underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, California Public Utilities Commission, Chino Hills, Hope For The Hills, lawsuit against Southern California Edison, monopole transmission towers, power line health impacts, power line property value impacts, power line safety impacts, power line visual impacts, Southern California Edison, Tehachapi Renewable Transmission Project, underground power lines
Bury Power Lines to Avert Power Outages
• July 3, 2012 • Comments Off on Bury Power Lines to Avert Power OutagesPosted in Aesthetic Impacts, Agricultural Impacts, Aircraft Impacts, AltaLink, bury power lines, Burying High Voltage Lines, Edmonton (City of), Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Livestock Impacts, Pipeline Impacts, Power outages, Property Value Impacts, Safety Impacts, Sherwood Park, Tourism Impacts, underground power lines, Visual Impacts
Tags: AltaLink, Bury high voltage lines, bury power lines, City of Edmonton, EPCOR, Heartland Transmission Project, negative power line impacts, power line aesthetic impacts, power line agriculture impacts, power line aircraft impacts, power line damages, power line environmental impacts, power line health impacts, power line livestock impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line tourism impacts, power line visual impacts, power outages, Sherwood Park, underground power lines
Heartland Transmission Project Update
• June 26, 2012 • Comments Off on Heartland Transmission Project UpdatePosted in Aesthetic Impacts, Agricultural Impacts, Aircraft Impacts, Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alison Redford, AltaLink, ATCO Electric, Bill 50, bury power lines, Burying High Voltage Lines, Court of Appeal, Eastern Alberta Transmission Line, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Pipeline Impacts, Property Rights, Property Value Impacts, Public Consultation, Safety Impacts, Sherwood Park, SNC-Lavalin, Socio-economic Impacts, Southern Alberta Transmission Reinforcement Project, Tim LeRiche, Tourism Impacts, underground power lines, Western Alberta Transmission Line
Tags: Alberta Court of Appeal, Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, Alberta's Industrial Heartland, Alison Redford, Alison Redford political interference, AltaLink, ATCO Electric, Bill 50, Bury high voltage lines, bury power lines, Eastern Alberta Transmission Line, Edmonton Greenbelt, environmental impact assessment, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line agriculture impacts, power line aircraft impacts, power line environmental impacts, power line health impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, power line tourism impacts, private property rights, public consultation, Sherwood Park, Sherwood Park Greenbelt, SNC-Lavalin, Southern Alberta Transmission Reinforcement Project, Tim LeRiche, underground power lines, Western Alberta Transmission Line
Residents Worried about Power Lines and Tornadoes
• June 24, 2012 • Comments Off on Residents Worried about Power Lines and TornadoesPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, ice storm, Tornado, TransAlta, underground power lines, Western Alberta Transmission Line
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Gleniffer Lake, ice storm impacts on power lines, tornado impacts on power lines, Transalta, underground power lines, Western Alberta Transmission Line
AUC Power Line Hearing May Be Postponed
• June 12, 2012 • Comments Off on AUC Power Line Hearing May Be PostponedPosted in Alberta Utilities Commission, AltaLink, Bill 19, Bill 50, bury power lines, Burying High Voltage Lines, Court of Appeal, Electricity Costs, Electricity: Deregulation, Electricity: Export, Environmental Impacts, EPCOR, Heartland Transmission Project, Property Rights, SNC-Lavalin, underground power lines, Visual Impacts, Western Alberta Transmission Line
Tags: Alberta Court of Appeal, Alberta Utilities Commission, Alison Redford political interference, AltaLink, Bill 19, Bill 50, Bury high voltage lines, bury power lines, constitutional challenge, electricity deregulation, electricity export, environmental impact assessment, EPCOR, Heartland Transmission Project, high electricity costs, power line environmental impacts, power line visual impacts, private property rights, public interest, SNC-Lavalin, underground power lines, Western Alberta Transmission Line
Hot Air Balloons Crash Into Power Lines
• June 7, 2012 • Comments Off on Hot Air Balloons Crash Into Power LinesPosted in bury power lines, Burying High Voltage Lines, fire hazard, hot air balloons, Safety Impacts, underground power lines
Tags: airplane hazard, Bury high voltage lines, bury power lines, helicopter hazard, hot air balloons crash, paraglider hazard, power line burns, power line fire hazard, power line safety impacts, underground power lines
EPCOR Should Practise What It Preaches
• June 6, 2012 • Comments Off on EPCOR Should Practise What It PreachesPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Don Lowry, EPCOR, Heartland Transmission Project, Public Consultation, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Don Lowry, EPCOR, Heartland Transmission Project, public consultation, underground power lines
Antelope Valley Clearview Transmission Project – Underground
• June 6, 2012 • Comments Off on Antelope Valley Clearview Transmission Project – UndergroundPosted in Aesthetic Impacts, Agricultural Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Electricity: Coal-fired, Environmental Impacts, Health Impacts, High Desert Power Authority, Net Zero City, Property Value Impacts, Renewable energy, Safety Impacts, Socio-economic Impacts, Solar energy, Tourism Impacts, underground power lines, Wind energy
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Alternative Energy Capital of the World, Antelope Valley Clearview Transmission Project, Beautiful Earth Group, Bury high voltage lines, bury power lines, Coal-fired electricity, High Desert Power Authority, negative power line impacts, Net Zero City, power line agriculture impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line tourism impacts, power line visual impacts, renewable energy, solar energy, Trans Bay Cable Project, underground power lines, wind energy
Fishhawk Ranch Opposition to Power Line Grows
• June 6, 2012 • Comments Off on Fishhawk Ranch Opposition to Power Line GrowsPosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, FishHawk Ranch, Health Impacts, Heartland Transmission Project, Property Value Impacts, Randall Area Youth Service Council, Sherwood Park, Tampa Electric Co., underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, Channing Park, conservation area, FishHawk Ranch, Heartland Transmission Project, negative power line impacts, Newland Communities, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line opposition, power line property value impacts, power line visual impacts, Randall Area Youth Service Council, Sherwood Park Greenbelt, Tampa Electric Co., underground power lines
AUC Heartland Decision Not in Best Public Interest
• May 15, 2012 • Comments Off on AUC Heartland Decision Not in Best Public InterestPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Electromagnetic Fields, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, John Kristensen, Linda Osinchuk, Proximity, Sherwood Park, SNC-Lavalin, Strathcona County, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Colchester Elementary School, EPCOR, Heartland Transmission Project, John Kristensen, Linda Osinchuk, negative power line impacts, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line opposition, school closing, Sherwood Park Greenbelt, SNC-Lavalin, Strathcona County, underground power lines
Chino Hills Power Line Battle – YouTube
• May 3, 2012 • Comments Off on Chino Hills Power Line Battle – YouTubePosted in bury power lines, Burying High Voltage Lines, Chino Hills, Compensation, Curt Hagman, Hope For The Hills, Property Value Impacts, Southern California Edison, underground power lines, Youtube
Tags: Bury high voltage lines, bury power lines, Chino Hills, Curt Hagman, Hope For The Hills, Hope For The Hills YouTube, power line compensation, power line opposition, power line property value impacts, Southern California Edison, underground power lines
Montville, New Jersey Petition to Bury Power Line
• April 30, 2012 • Comments Off on Montville, New Jersey Petition to Bury Power LinePosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, Health Impacts, Petition, Property Value Impacts, PSE&G, Susquehanna-Roseland Power Line, underground power lines, Visual Impacts
Tags: Allison Para, Bury high voltage lines, bury power lines, negative power line impacts, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line petition, power line property value impacts, power line visual impacts, PSE&G, Susquehanna-Roseland Power LIne, underground power lines
Towers Kill Millions of Birds
• April 29, 2012 • Comments Off on Towers Kill Millions of BirdsPosted in Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Bird Deaths, bury power lines, Burying High Voltage Lines, Environmental Impacts, Heartland Transmission Project, Property Value Impacts, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Bury high voltage lines, bury power lines, Heartland Transmission Project, power line bird deaths, power line environmental impacts, power line property value impacts, underground power lines
Fort Saskatchewan-Vegreville Candidates’ Views on Heartland Line
• April 22, 2012 • Comments Off on Fort Saskatchewan-Vegreville Candidates’ Views on Heartland LinePosted in Alberta Electric System Operator, Alberta Government, Alberta NDP, Alberta P.C. Party, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Chris Fulmer, Compensation, Electricity Costs, Electricity: Export, EverGreen, Fort Saskatchewan-Vegreville, Heartland Transmission Project, Jacquie Fenske, Matt Levicki, Peter Schneider, Shannon Stubbs, underground power lines
Tags: Alberta Electric System Operator, Alberta NDP, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Bill 50, Bury high voltage lines, bury power lines, Chris Fulmer, electricity costs, electricity export, EverGreen, Fort Saskatchewan-Vegreville, Heartland Transmission Project, Jacquie Fenske, Matt Levicki, Peter Schneider, power line compensation, power line opposition, repeal Bill 50, Shannon Stubbs, underground power lines
Strathcona-Sherwood Park Candidates’ Views on Heartland Line
• April 22, 2012 • Comments Off on Strathcona-Sherwood Park Candidates’ Views on Heartland LinePosted in Alberta Government, Alberta Liberal Party, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Dave Quest, Electricity: Generation, Heartland Transmission Project, John Murray, Mike Scott, Paul Nemetchek, Strathcona-Sherwood Park, underground power lines
Tags: Alberta Liberal Party, Alberta NDP, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, Bury high voltage lines, bury power lines, Dave Quest, electricity transmission, Heartland Transmission Project, John Murray, Mike Scott, Paul Nemetchek, power line opposition, Strathcona-Sherwood Park constituency, underground power lines
Sherwood Park Candidates’ Views on Heartland Power Line
• April 21, 2012 • Comments Off on Sherwood Park Candidates’ Views on Heartland Power LinePosted in Alberta Electric System Operator, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Wildrose Party, Alison Redford, Bill 50, bury power lines, Burying High Voltage Lines, Cathy Olesen, Chris Kuchmak, Colchester Elementary School, Danielle Smith, Dave Anderson, Electricity Costs, Electricity: Export, Garnett Genuis, Gordon Barrett, Jim Ford, Lyndsay Pinder, Sherwood Park, Social Credit, underground power lines
Tags: Alberta Electric System Operator, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Alison Redford, Bill 50, Bury high voltage lines, bury power lines, Cathy Olesen, Chris Kuchmak, Colchester Elementary School, Danielle Smith, Dave Anderson, electricity costs, electricity export, Garnett Genuis, Gordon Barrett, Heartland Transmission Project, Jim Ford, Lyndsay Pinder, repeal Bill 50, Sherwood Park, Sherwood Park Greenbelt, Social Credit, underground power lines
Sherwood Park Residents Angry About Heartland Line
• April 20, 2012 • Comments Off on Sherwood Park Residents Angry About Heartland LinePosted in Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Cathy Olesen, Colchester Elementary School, Court of Appeal, Environmental Impacts, EPCOR, Garnett Genuis, Heartland Transmission Project, Sherwood Park, underground power lines
Tags: Alberta Court of Appeal, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Alison Redford political interference, Bill 50, Bury high voltage lines, bury power lines, Cathy Olesen, Colchester Elementary School, EPCOR, Garnett Genuis, Heartland Transmission Project, power line environmental impacts, Sherwood Park, Sherwood Park Greenbelt, underground power lines
Hundreds Attend Chino Hills Power Line Hearing
• April 15, 2012 • Comments Off on Hundreds Attend Chino Hills Power Line HearingPosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Chino Hills, Electromagnetic Fields, Federal Housing Administration, Health Impacts, Hope For The Hills, Property Value Impacts, Safety Impacts, Southern California Edison, Tehachapi Renewable Transmission Project, underground power lines, Visual Impacts
Tags: Bury high voltage lines, bury power lines, Chino Hills, Federal Housing Administration, Hope For The Hills, power line electromagnetic fields, power line health impacts, power line opposition, power line property value impacts, power line safety impacts, power line visual impacts, Southern California Edison, Tehachapi Renewable Transmission Project, underground power lines
Alberta Leaders’ Debate – Electricity
• April 14, 2012 • Comments Off on Alberta Leaders’ Debate – ElectricityPosted in Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, ATCO Electric, Bill 19, Bill 50, Brian Mason, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Danielle Smith, Electricity Costs, Electricity: Coal-fired, Electricity: Deregulation, Electricity: Generation, Environmental Impacts, EPCOR, Heartland Transmission Project, Public Opinion Survey, Raj Sherman, SNC-Lavalin, underground power lines
Tags: Alberta Liberal Party, Alberta NDP, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Alison Redford political interference, AltaLink, ATCO Electric, Bill 19, Bill 50, Brian Mason, Bury high voltage lines, bury power lines, Coal-fired electricity, Colchester Elementary School, Danielle Smith, electricity costs, electricity deregulation, electricity generation, electricity transmission, environmental impact assessment, EPCOR, Heartland Transmission Project, Leaders' debate poll, political donations, power line environmental impacts, power line opposition, Raj Sherman, SNC-Lavalin, underground power lines
Dave Quest on Defensive Re Power Lines
• April 12, 2012 • Comments Off on Dave Quest on Defensive Re Power LinesPosted in Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Wildrose Party, bury power lines, Burying High Voltage Lines, Dave Quest, Electricity: Coal-fired, Heartland Transmission Project, John Murray, Mike Scott, Paul Nemetchek, Rick Orman, Strathcona-Sherwood Park, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Bury high voltage lines, bury power lines, Coal-fired electricity, Dave Quest, greenhouse gases, Heartland Transmission Project, John Murray, Mike Scott, Paul Nemetchek, Rick Orman, Strathcona-Sherwood Park, underground power lines
Sherwood Park Residents Angry About Power Line
• April 9, 2012 • Comments Off on Sherwood Park Residents Angry About Power LinePosted in Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Utilities Commission, Alberta Wildrose Party, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Cathy Olesen, Chris Kuchmak, Danielle Smith, Dave Anderson, Dave Quest, Electricity Costs, Environmental Impacts, EPCOR, Garnett Genuis, Gordon Barrett, Heartland Transmission Project, Iris Evans, Jim Ford, Linda Osinchuk, Lyndsay Pinder, Sherwood Park, Social Credit, Strathcona County, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, AltaLink, Bill 50, Bury high voltage lines, bury power lines, Cathy Olesen, Chris Kuchmak, Danielle Smith, Dave Anderson, Dave Quest, electricity costs, environmental impact assessment, EPCOR, Garnett Genuis, Gordon Barrett, Heartland Transmission Project, Iris Evans, Jim Ford, Linda Osinchuk, Lyndsay Pinder, power line environmental impacts, power line opposition, Sherwood Park, Sherwood Park Greenbelt, Social Credit, Strathcona County, Strathcona County Hospital, underground power lines
Wildrose Strong in Sherwood Park
• April 8, 2012 • Comments Off on Wildrose Strong in Sherwood ParkPosted in Alberta Industrial Heartland Assoc, Alberta P.C. Party, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Cathy Olesen, Dave Quest, Garnett Genuis, Heartland Transmission Project, Industrial Power Consumer's Assoc AB, Iris Evans, Linda Osinchuk, Paul Nemetchek, Proximity, Sherwood Park, Strathcona County, Strathcona-Sherwood Park, underground power lines
Tags: Alberta Industrial Heartland Association, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Bill 50, Bury high voltage lines, bury power lines, Cathy Olesen, Dave Quest, Garnett Genuis, Heartland Transmission Project, Industrial Power Consumers Association of Alberta, Iris Evans, Linda Osinchuk, Paul Nemetchek, power line opposition, repeal Bill 50, Sherwood Park, Strathcona County, Strathcona-Sherwood Park, underground power lines
Ted Morton in Trouble Over Power Lines
• April 8, 2012 • Comments Off on Ted Morton in Trouble Over Power LinesPosted in Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Chestermere-Rocky View, Colchester Elementary School, Court of Appeal, Eastern Alberta Transmission Line, Environmental Impacts, EPCOR, Heartland Transmission Project, Land-use, Property Rights, Proximity, SNC-Lavalin, Ted Morton, underground power lines, Western Alberta Transmission Line, Youtube
Tags: Alberta Court of Appeal, Alberta Government, Alberta PC Party, Alberta PC Party leadership promises, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Alison Redford political interference, AltaLink, Bill 50, Bury high voltage lines, bury power lines, Chestermere-Rocky View, Colchester Elementary School, Eastern Alberta Transmission Line, EPCOR, Heartland Transmission Project, land-use, negative power line impacts, power line environmental impacts, power line opposition, property rights, SNC-Lavalin, Ted Morton, Ted Morton Youtube, underground power lines, Western Alberta Transmission Line
Overhead Power Lines Taken Out by Snow
• April 6, 2012 • Comments Off on Overhead Power Lines Taken Out by SnowPosted in bury power lines, Burying High Voltage Lines, EPCOR, Power outages, underground power lines
Tags: Bury high voltage lines, bury power lines, Edmonton snow storm, EPCOR, lost labour productivity, power line damages, power outages, underground power lines
PCs Promise More Schools While They Close Another One Down
• April 5, 2012 • Comments Off on PCs Promise More Schools While They Close Another One DownPosted in Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Dave Quest, Elk Island Public Schools, EPCOR, Health Impacts, Heartland Transmission Project, Safety Impacts, SNC-Lavalin, Strathcona County, underground power lines
Tags: Alberta election poll, Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Alison Redford promises, AltaLink, Bury high voltage lines, bury power lines, Colchester Elementary School, Dave Quest, Elk Island Public Schools, EPCOR, Heartland Transmission Project, negative power line impacts, power line opposition, school closing, SNC-Lavalin, Strathcona County, underground power lines
Wildrose vs. PCs on Electricity
• April 4, 2012 • Comments Off on Wildrose vs. PCs on ElectricityPosted in Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Bill 50, bury power lines, Burying High Voltage Lines, Danielle Smith, Electricity Costs, Electricity: Co-generation, Electricity: Coal-fired, Electricity: Gas-fired, Electricity: Generation, Heartland Transmission Project, underground power lines
Tags: Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Bill 50, Bury high voltage lines, bury power lines, Coal-fired electricity, Danielle Smith, electricity cogeneration, electricity costs, electricity gas-fired, electricity generation, Heartland Transmission Project, underground power lines
Garnett Genuis Fighting Unnecessary Heartland Line
• April 2, 2012 • Comments Off on Garnett Genuis Fighting Unnecessary Heartland LinePosted in Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Danielle Smith, Garnett Genuis, Heartland Transmission Project, Proximity, Sherwood Park, underground power lines, Youtube
Tags: Alberta Government, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, Bury high voltage lines, bury power lines, Danielle Smith, Garnett Genuis, Heartland Transmission Project, high voltage power line, power line opposition, Sherwood Park, underground power lines
Bill 50 Power Lines in Alberta May Be Stopped
• March 30, 2012 • Comments Off on Bill 50 Power Lines in Alberta May Be StoppedPosted in Aesthetic Impacts, Agricultural Impacts, Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Wildrose Party, Bill 19, Bill 50, bury power lines, Burying High Voltage Lines, Danielle Smith, Eastern Alberta Transmission Line, Electricity: Co-generation, Electricity: Coal-fired, Electricity: Gas-fired, Electricity: Generation, Environmental Impacts, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, Safety Impacts, Tar Sands Upgrader, Tourism Impacts, underground power lines, Western Alberta Transmission Line
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Bill 19, Bill 50, Bury high voltage lines, bury power lines, Coal-fired electricity, Danielle Smith, Eastern Alberta Transmission Line, electricity cogeneration, electricity gas-fired, electricity transmission, Heartland Transmission Project, high voltage power line, negative power line impacts, power line opposition, tar sands upgrader, underground power lines, Western Alberta Transmission Line
PC Candidates Don’t Understand Electricity Issues
• March 26, 2012 • Comments Off on PC Candidates Don’t Understand Electricity IssuesPosted in Alberta P.C. Party, Alberta Utilities Commission, Bill 19, Bill 50, bury power lines, Burying High Voltage Lines, Electricity: Co-generation, Electricity: Coal-fired, Heartland Transmission Project, Maureen Kubinek, Tar Sands Upgrader, underground power lines
Tags: Alberta Government, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Bill 19, Bill 50, Bury high voltage lines, bury power lines, Coal-fired electricity, electricity cogeneration, Heartland Transmission Project, Maureen Kubinek, power line opposition, tar sands upgrader, underground power lines
New South Wales Community Pushes to Bury Power Lines
• March 23, 2012 • Comments Off on New South Wales Community Pushes to Bury Power LinesPosted in bury power lines, Burying High Voltage Lines, Manning Alliance, TransGrid, underground power lines
Tags: Bury high voltage lines, bury power lines, Manning Alliance, negative power line impacts, TransGrid, underground power lines
Overhead Transmission Lines Being Taken Down in the UK
• March 22, 2012 • Comments Off on Overhead Transmission Lines Being Taken Down in the UKPosted in Aesthetic Impacts, Alberta Electric System Operator, bury power lines, Burying High Voltage Lines, Electricity North West, Tourism Impacts, underground power lines, Visual Impacts
Tags: Alberta Electric System Operator, Bury high voltage lines, bury power lines, Electricity North West, power line aesthetic impacts, power line tourism impacts, power line visual impacts, underground power lines
Landowner Compensation for Power Lines Based on Property Devaluation
• March 21, 2012 • Comments Off on Landowner Compensation for Power Lines Based on Property DevaluationPosted in Aesthetic Impacts, AltaLink, ATCO Electric, bury power lines, Burying High Voltage Lines, Compensation, Environmental Impacts, EPCOR, Livestock Impacts, Property Value Impacts, Safety Impacts, Tourism Impacts, TransGrid, underground power lines
Tags: Alberta Government, AltaLink, ATCO Electric, Bury high voltage lines, bury power lines, EPCOR, power line compensation, power line environmental impacts, power line livestock impacts, power line property value impacts, power line safety impacts, power line tourism impacts, TransGrid, underground power lines
Weather Damage to Overhead Power Lines
• March 14, 2012 • Comments Off on Weather Damage to Overhead Power LinesPosted in bury power lines, Burying High Voltage Lines, Consumer Energy, Great Lakes Energy, Hurricane, Safety Impacts, Tornado, underground power lines
Tags: Bury high voltage lines, bury power lines, Consumer Energy, Great Lakes Energy, hurricane impacts on power lines, ice storm impacts on power lines, power outages, Puget Sound Energy, tornado impacts on power lines, underground power lines
Update on Chino Hills Project
• March 9, 2012 • Comments Off on Update on Chino Hills ProjectPosted in bury power lines, Burying High Voltage Lines, Chino Hills, Hope For The Hills, Proximity, underground power lines
Tags: Bury high voltage lines, bury power lines, California Public Utilities Commission, Chino Hills, Hope For The Hills, underground power lines
Election Call Imminent
• March 8, 2012 • Comments Off on Election Call ImminentPosted in Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Wildrose Party, bury power lines, Burying High Voltage Lines, Cathy Olesen, Dave Quest, Electricity Costs, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Bury high voltage lines, bury power lines, Cathy Olesen, Dave Quest, electricity costs, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, Sherwood Park, Strathcona-Sherwood Park, underground power lines
They’re Burying Lines Everywhere Else But Alberta
• February 28, 2012 • Comments Off on They’re Burying Lines Everywhere Else But AlbertaPosted in ABB, Agricultural Impacts, Alberta Government, Alison Redford, AltaLink, ATCO Electric, Bill 50, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, EPCOR, Health Impacts, Livestock Impacts, Pipeline Impacts, Property Value Impacts, Proximity, Safety Impacts, Socio-economic Impacts, Tourism Impacts, Transmission Developers Inc., underground power lines
Tags: ABB, Alberta Government, Alberta provincial election, Alison Redford, AltaLink, ATCO Electric, Bill 50, Bury high voltage lines, bury power lines, EPCOR, power line agriculture impacts, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line livestock impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, power line tourism impacts, Transmission Developers Inc., underground power lines
Premier Redford Taken to Task by Strathcona County Mayor Linda Osinchuk
• February 17, 2012 • Comments Off on Premier Redford Taken to Task by Strathcona County Mayor Linda OsinchukPosted in Alberta Government, Alberta P.C. Party, Alison Redford, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Garnett Genuis, Heartland Transmission Project, Linda Osinchuk, Proximity, Strathcona County, underground power lines
Tags: Alberta Government, Alberta PC Party, Alison Redford, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Garnett Genuis, Heartland Transmission Project, Linda Osinchuk, Sherwood Park, Sherwood Park Chamber of Commerce, Strathcona County, underground power lines
Danielle Smith on the Heartland Line
• February 14, 2012 • Comments Off on Danielle Smith on the Heartland LinePosted in Alberta Government, Alberta P.C. Party, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Danielle Smith, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, Tar Sands Upgrader, underground power lines
Tags: Alberta Government, Alberta PC Party, Alberta Wildrose Party, Bill 50, Bury high voltage lines, bury power lines, Colchester Elementary School, Danielle Smith, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, repeal Bill 50, Sherwood Park, tar sands upgrader, underground power lines
RETA Releases New Ads
• February 13, 2012 • Comments Off on RETA Releases New AdsPosted in Alberta Government, Alberta P.C. Party, Alison Redford, bury power lines, Burying High Voltage Lines, Colchester Elementary School, dontclosemyschool.com, Elk Island Public Schools, Garnett Genuis, Heartland Transmission Project, underground power lines
Tags: Alberta Government, Alberta PC Party, Alison Redford, Bury high voltage lines, bury power lines, Colchester Elementary School, dontclosemyschool.com, Elk Island Public Schools, Garnett Genuis, Heartland Transmission Project, underground power lines
Budget Offers Nothing for Colchester Students
• February 11, 2012 • Comments Off on Budget Offers Nothing for Colchester StudentsPosted in Alberta Government, Alberta P.C. Party, Alison Redford, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Elk Island Public Schools, Heartland Transmission Project, Proximity, underground power lines
Tags: Alberta Government, Alberta PC Party, Alison Redford, Bury high voltage lines, bury power lines, Colchester Elementary School, Elk Island Public Schools, Fultonvale School, Heartland Transmission Project, underground power lines
Danielle Smith meets with RETA and other Transmission Line Stakeholders
• February 9, 2012 • Comments Off on Danielle Smith meets with RETA and other Transmission Line StakeholdersPosted in Alberta Government, Alberta Wildrose Party, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Danielle Smith, Gabriel Chemello, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, Strathcona County, underground power lines
Tags: Alberta Government, Alberta Wildrose Party, Bury high voltage lines, bury power lines, Colchester Elementary School, Danielle Smith, Gabriel Chemello, Garnett Genuis, Heartland Transmission Project, Paul Nemetchek, Strathcona County, underground power lines
Elk Island Making Contingency Plans for Colchester
• February 2, 2012 • Comments Off on Elk Island Making Contingency Plans for ColchesterPosted in bury power lines, Burying High Voltage Lines, Colchester Elementary School, Elk Island Public Schools, Heartland Transmission Project, underground power lines
Tags: Alberta Government, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, Elk Island Public Schools, Fultonvale Elementary Junior High School, Heartland Transmission Project, underground power lines
Danielle Smith says “Bury the Line”
• February 1, 2012 • Comments Off on Danielle Smith says “Bury the Line”Posted in Alberta Government, Alberta P.C. Party, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Danielle Smith, Electricity Costs, Electricity: Deregulation, Heartland Transmission Project, underground power lines
Tags: Alberta Government, Alberta PC Party, Alberta Wildrose Party, Bury high voltage lines, bury power lines, Danielle Smith, electricity costs, electricity deregulation, Heartland Transmission Project, repeal Bill 50, Sherwood Park, underground power lines
Colchester Fights On, Power Companies Sow Confusion
• January 31, 2012 • Comments Off on Colchester Fights On, Power Companies Sow ConfusionPosted in Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Darin Watson, Elk Island Public Schools, EPCOR, Gabriel Chemello, Heartland Transmission Project, Proximity, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Colchester Elementary School, Darin Watson, Elk Island Public Schools, EPCOR, Gabriel Chemello, Heartland Transmission Project, underground power lines
Is More Democracy the Answer?
• January 26, 2012 • Comments Off on Is More Democracy the Answer?Posted in Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Wildrose Party, Alison Redford, bury power lines, Burying High Voltage Lines, Cathy Olesen, Danielle Smith, Dave Quest, Heartland Transmission Project, Iris Evans, Newt Gingrich, Northern Pass Project, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Alison Redford, Bury high voltage lines, bury power lines, Cathy Olesen, Danielle Smith, Dave Quest, Heartland Transmission Project, Iris Evans, Newt Gingrich, Northern Pass Project, private property rights, underground power lines
How Do We Fix Electricity Transmission in Alberta?
• January 24, 2012 • Comments Off on How Do We Fix Electricity Transmission in Alberta?Posted in Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Electricity: Gas-fired, EPCOR, Heartland Transmission Project, Proximity, Ted Morton, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, electricity costs, EPCOR, Heartland Transmission Project, natural gas-fired electricity, repeal Bill 50, Ted Morton, underground power lines
4 Candidates Fighting the Heartland Transmission Line
• January 22, 2012 • Comments Off on 4 Candidates Fighting the Heartland Transmission LinePosted in Agricultural Impacts, Alberta Government, Alberta P.C. Party, Alberta Wildrose Party, Bill 50, bury power lines, Burying High Voltage Lines, Compensation, Garnett Genuis, Heartland Transmission Project, Industrial Power Consumer's Assoc AB, Paul Nemetchek, Property Value Impacts, Proximity, Shannon Stubbs, Socio-economic Impacts, Travis Olson, underground power lines
Tags: Alberta Government, Alberta PC Party, Alberta provincial election, Alberta Wildrose Party, Athabasca-Sturgeon-Redwater constituency, Bill 50, Bury high voltage lines, bury power lines, electricity costs, Fort Saskatchewan-Vegreville, Fraser Institute, Garnett Genuis, Heartland Transmission Project, Industrial Power Consumers Association of Alberta, Paul Nemetchek, power line agriculture impacts, power line compensation, power line property value impacts, power line socio-economic impacts, Shannon Stubbs, Sherwood Park, Strathcona-Sherwood Park, Travis Olson, underground power lines
Sherwood Park PC Nomination and Newt Gingrich
• January 21, 2012 • Comments Off on Sherwood Park PC Nomination and Newt GingrichPosted in Alberta Government, Alberta P.C. Party, bury power lines, Burying High Voltage Lines, Cathy Olesen, Heartland Transmission Project, Helen Calahasen, Linda Osinchuk, Newt Gingrich, underground power lines
Tags: Alberta Government, Alberta PC Party, Bury high voltage lines, bury power lines, Cathy Olesen, Heartland Transmission Project, Helen Calahasen, Linda Osinchuk, Newt Gingrich, Sherwood Park, underground power lines
AltaLink Offers to Cost-Share Burying Heartland line by Colchester School
• January 20, 2012 • Comments Off on AltaLink Offers to Cost-Share Burying Heartland line by Colchester SchoolPosted in Alberta Government, Alberta Utilities Commission, AltaLink, Bill Suter, Bruce Beliveau, Bruce Brandell, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Corona Effect, Darin Watson, Electromagnetic Fields, Elk Island Public Schools, EPCOR, Gabriel Chemello, Health Impacts, Heartland Transmission Project, Proximity, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, Bill Suter, Bruce Beliveau, Bruce Brandell, Bury high voltage lines, bury power lines, Colchester Elementary School, corona effect, Darin Watson, Elk Island Public Schools, EPCOR, Gabriel Chemello, Health, Heartland Transmission Project, power line electromagnetic fields, power line safety impacts, Strathcona County, underground power lines
Letters to the Editor Respond to Sherwood Park News Editorial (full version)
• January 20, 2012 • Comments Off on Letters to the Editor Respond to Sherwood Park News Editorial (full version)Posted in Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, Brenda Astle, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Critical Transmission Review Committee, Eastern Alberta Transmission Line, Heartland Transmission Project, Iris Evans, John Kristensen, Public Consultation, Strathcona County, underground power lines, Western Alberta Transmission Line
Tags: Alberta Government, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Bill 50, Brenda Astle, Bury high voltage lines, bury power lines, Colchester Elementary School, Critical Transmission Review Committee, Eastern Alberta Transmission Line, Heartland Transmission Project, Iris Evans, John Kristensen, public consultation, Sherwood Park, Sherwood Park Greenbelt, Strathcona County, Strathcona-Sherwood Park, underground power lines, Western Alberta Transmission Line
Sherwood Park News Editorial Gets it Wrong
• January 17, 2012 • Comments Off on Sherwood Park News Editorial Gets it WrongPosted in Alberta Government, Alberta Utilities Commission, Bill 50, bury power lines, Burying High Voltage Lines, Court of Appeal, Heartland Transmission Project, Iris Evans, Sherwood Park, underground power lines
Tags: Alberta Court of Appeal, Alberta Government, Alberta provincial election, Alberta Utilities Commission, Bill 50, Bury high voltage lines, bury power lines, Heartland Transmission Project, Iris Evans, Sherwood Park, underground power lines
Colchester School Supports RETA AUC Heartland Appeal
• January 14, 2012 • Comments Off on Colchester School Supports RETA AUC Heartland AppealPosted in Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Corona Effect, Dave Quest, Electromagnetic Fields, EPCOR, Gabriel Chemello, Health Impacts, Heartland Transmission Project, Iris Evans, Proximity, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta Government, Alberta PC Party, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, corona effect, Dave Quest, EPCOR, Gabriel Chemello, Heartland Transmission Project, Iris Evans, power line electromagnetic fields, power line health impacts, power line safety impacts, Strathcona County, underground power lines
More on School Closing Due to Heartland Line
• January 11, 2012 • Comments Off on More on School Closing Due to Heartland LinePosted in Alberta Government, Alberta Industrial Heartland Assoc, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Edmonton (City of), EPCOR, Gabriel Chemello, Health Impacts, Heartland Transmission Project, Pipeline Impacts, Proximity, Safety Impacts, Strathcona County, Sturgeon County, underground power lines
Tags: Alberta Government, Alberta Industrial Heartland Association, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, City of Edmonton, Colchester Elementary School, EPCOR, Gabriel Chemello, Heartland Transmission Project, power line health impacts, power line pipeline impacts, power line safety impacts, Strathcona County, Sturgeon County, underground power lines
Utility Companies Proposed Route Changes are another Smokescreen
• January 11, 2012 • Comments Off on Utility Companies Proposed Route Changes are another SmokescreenPosted in Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, Bretona Pond, Bury high voltage lines, bury power lines, Colchester Elementary School, EPCOR, Heartland Transmission Project, power line environmental impacts, power line health impacts, power line property value impacts, underground power lines
Newt Gingrich Supports Undergrounding in New Hampshire
• January 7, 2012 • Comments Off on Newt Gingrich Supports Undergrounding in New HampshirePosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Newt Gingrich, underground power lines
Tags: Bury high voltage lines, bury power lines, Newt Gingrich, power line aesthetic impacts, power line visual impacts, underground power lines
Bury Power Line Says U.S. Presidential Candidate
• January 6, 2012 • Comments Off on Bury Power Line Says U.S. Presidential CandidatePosted in Aesthetic Impacts, Alberta Government, Alberta P.C. Party, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Health Impacts, Heartland Transmission Project, Newt Gingrich, Northern Pass Project, Property Value Impacts, Proximity, underground power lines
Tags: Alberta Government, Alberta PC Party, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, Newt Gingrich, Northern Pass Project, power line aesthetic impacts, power line health impacts, power line property value impacts, power line visual impacts, underground power lines
RETA in the News
• January 6, 2012 • Comments Off on RETA in the NewsPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Heartland Transmission Project, underground power lines
Southern Alberta fire caused by downed power line
• January 6, 2012 • Comments Off on Southern Alberta fire caused by downed power linePosted in bury power lines, Burying High Voltage Lines, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, power line fire hazard, power line safety impacts, underground power lines
Australia Moving Towards More Undergrounding
• January 3, 2012 • Comments Off on Australia Moving Towards More UndergroundingPosted in Alberta Government, bury power lines, Burying High Voltage Lines, underground power lines
Tags: Alberta Government, Bury high voltage lines, bury power lines, underground power lines
Happy New Year, and Take Heart!
• January 1, 2012 • Comments Off on Happy New Year, and Take Heart!Posted in Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Bill 50, bury power lines, Burying High Voltage Lines, Ed Stelmach, Electromagnetic Fields, Heartland Transmission Project, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta provincial election, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, Bill 50, Bury high voltage lines, bury power lines, Ed Stelmach, Heartland Transmission Project, power line electromagnetic fields, repeal Bill 50, underground power lines
RETA files appeal of AUC Decision on Heartland Transmission Project
• December 30, 2011 • Comments Off on RETA files appeal of AUC Decision on Heartland Transmission ProjectPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Edmonton (City of), Electricity Costs, Electromagnetic Fields, Heartland Transmission Project, Strathcona County, Sturgeon County, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, City of Edmonton, Colchester Elementary School, Colchester School closing, Heartland Transmission Project, high electricity costs, power line electromagnetic fields, Sherwood Park, Strathcona County, Sturgeon County, underground power lines
Colchester School Supports Review of Heartland Decision
• December 30, 2011 • Comments Off on Colchester School Supports Review of Heartland DecisionPosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Health Impacts, Heartland Transmission Project, Proximity, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, Heartland Transmission Project, power line health impacts, power line safety impacts, Strathcona County, underground power lines
Burying Power lines supported by US Federal Emergency Management Agency
• December 29, 2011 • Comments Off on Burying Power lines supported by US Federal Emergency Management AgencyPosted in Bill 50, bury power lines, Burying High Voltage Lines, Health Impacts, Safety Impacts, underground power lines, US Federal Emergency Management Strategy
Tags: Bill 50, Bury high voltage lines, bury power lines, Hazard Mitigation Grant Program, power line health impacts, power line safety impacts, power outages, underground power lines, US Federal Emergency Management Strategy
Challenges Mounting Against AUC Power Line Decision
• November 30, 2011 • Comments Off on Challenges Mounting Against AUC Power Line DecisionPosted in Alberta Assoc Municipal Districts & Counties, Alberta Utilities Commission, Alison Redford, AltaLink, bury power lines, Burying High Voltage Lines, Court of Appeal, Don Rigney, Eastern Alberta Transmission Line, Electricity Costs, Electricity: Co-generation, Electricity: Coal-fired, EPCOR, Heartland Transmission Project, Karen Shaw, Strathcona County, Sturgeon County, Tar Sands Upgrader, underground power lines, Western Alberta Transmission Line
Tags: Alberta Association of Municipal Districts and Counties, Alberta Court of Appeal, Alberta Utilities Commission, Alison Redford, Alison Redford political interference, AltaLink, Bury high voltage lines, bury power lines, Coal-fired electricity, Don Rigney, Eastern Alberta Transmission Line, electricity cogeneration, electricity costs, EPCOR, Heartland Transmission Project, Karen Shaw, public interest, Sherwood Park Greenbelt, Strathcona County, Sturgeon County, tar sands upgrader, underground power lines, Western Alberta Transmission Line
The More Heartland Decision Appeals, the Better
• November 29, 2011 • Comments Off on The More Heartland Decision Appeals, the BetterPosted in Aesthetic Impacts, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Environmental Impacts, Health Impacts, Heartland Transmission Project, John Kristensen, Property Value Impacts, Proximity, Safety Impacts, Socio-economic Impacts, Strathcona County, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, Colchester School closing, Heartland Transmission Project, John Kristensen, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, public interest, Strathcona County, underground power lines
RETA to Appeal AUC Heartland Line Decision
• November 28, 2011 • Comments Off on RETA to Appeal AUC Heartland Line DecisionPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Alison Redford, AltaLink, Bill 19, Bill 50, Bruce Johnson, bury power lines, Burying High Voltage Lines, Compensation, Court of Appeal, Dave Quest, Electricity Costs, Electricity: Co-generation, Electricity: Coal-fired, Environmental Impacts, EPCOR, Gene Zwozdesky, Health Impacts, Heartland Transmission Project, Iris Evans, Jeff Johnson, Naresh Bhardwaj, Peter Sandhu, Property Rights, Property Value Impacts, Proximity, Public Consultation, Safety Impacts, SNC-Lavalin, Socio-economic Impacts, Strathcona County, Tar Sands Upgrader, Ted Morton, Tony Vandermeer, underground power lines
Tags: Alberta Court of Appeal, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Alberta's Industrial Heartland, Alison Redford, AltaLink, Bill 19, Bill 50, Bruce Johnson, Bury high voltage lines, bury power lines, Coal-fired electricity, Dave Quest, electricity cogeneration, electricity costs, environmental impact assessment, EPCOR, Gene Zwozdesky, Heartland Transmission Project, Iris Evans, Jeff Johnson, Naresh Bhardwaj, Peter Sandhu, power line aesthetic impacts, power line compensation, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, power line visual impacts, property rights, public consultation, public interest, SNC-Lavalin, Strathcona County, tar sands upgrader, Ted Morton, Tony Vandermeer, underground power lines
True Costs of Burying Heartland Line Required
• November 25, 2011 • Comments Off on True Costs of Burying Heartland Line RequiredPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Health Impacts, Heartland Transmission Project, Linda Osinchuk, Property Value Impacts, Proximity, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, Linda Osinchuk, power line aesthetic impacts, power line health impacts, power line property value impacts, power line safety impacts, Strathcona County, underground power lines
High Voltage Power Lines Must Be Buried
• November 23, 2011 • Comments Off on High Voltage Power Lines Must Be BuriedPosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Health Impacts, Proximity, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, ITC Holdings Inc., power line aesthetic impacts, power line health impacts, power line safety impacts, underground power lines
Successful Battle Against Overhead Power Line
• November 21, 2011 • Comments Off on Successful Battle Against Overhead Power LinePosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, California, Chino Hills, Health Impacts, Heartland Transmission Project, Hope For The Hills, Property Value Impacts, Proximity, Safety Impacts, Southern California Edison, underground power lines
Tags: Bury high voltage lines, bury power lines, California Public Utilities Commission, Chino Hills, Federal Housing Administration, Heartland Transmission Project, Hope For The Hills, power line aesthetic impacts, power line health impacts, power line property value impacts, power line safety impacts, power line visual impacts, Southern California Edison, underground power lines
Pressure Grows to Bury Power Lines
• November 21, 2011 • Comments Off on Pressure Grows to Bury Power LinesPosted in Aesthetic Impacts, Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Environmental Impacts, Health Impacts, Proximity, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, Axpo, Bury high voltage lines, bury power lines, negative power line impacts, power line environmental impacts, power line health impacts, power line visual impacts, transmission loss costs, underground power lines
AUC Heartland Power Line Decision – Fallout
• November 15, 2011 • Comments Off on AUC Heartland Power Line Decision – FalloutPosted in Aesthetic Impacts, Agricultural Impacts, Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alison Redford, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Chris Fulmer, Colchester Elementary School, Compensation, Edmonton (City of), Electricity: Co-generation, Electricity: Coal-fired, Electricity: Gas-fired, Elk Island Public Schools, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, Public Consultation, Safety Impacts, SNC-Lavalin, Strathcona County, Sturgeon County, Thomas Lukaszuk, underground power lines, World Bank
Tags: Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, Alison Redford, Alison Redford political interference, AltaLink, Bill 50, Bury high voltage lines, bury power lines, City of Edmonton, Coal-fired electricity, Colchester Elementary School, Colchester School closing, electricity cogeneration, Elk Island Public Schools, EPCOR, Heartland Transmission Project, natural gas-fired electricity, power line agriculture impacts, power line compensation, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, public consultation, public interest, Sherwood Park Greenbelt, SNC-Lavalin, Strathcona County, Sturgeon County, Thomas Lukaszuk, underground power lines
Colchester School to Fight Heartland Power Line Decision
• November 15, 2011 • Comments Off on Colchester School to Fight Heartland Power Line DecisionPosted in Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Cheryl Przybilla, Colchester Elementary School, Elk Island Public Schools, Health Impacts, Heartland Transmission Project, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, Bury high voltage lines, bury power lines, Cheryl Przybilla, Colchester Elementary School, Colchester School closing, Elk Island Public Schools, Heartland Transmission Project, power line health impacts, power line safety impacts, Strathcona County, underground power lines
Premier Must Consider Heartland Facts
• October 14, 2011 • Comments Off on Premier Must Consider Heartland FactsPosted in Aesthetic Impacts, Agricultural Impacts, Alberta Government, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Electricity: Co-generation, Electricity: Coal-fired, Environmental Impacts, EPCOR, Garnett Genuis, Health Impacts, Heartland Transmission Project, John Kristensen, Livestock Impacts, Property Value Impacts, Proximity, Safety Impacts, Strathcona County, Tar Sands Upgrader, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, Alberta Wildrose Party, Alison Redford, AltaLink, Bill 50, Bury high voltage lines, bury power lines, Coal-fired electricity, electricity cogeneration, EPCOR, Garnett Genuis, Heartland Transmission Project, John Kristensen, negative power line impacts, power line aesthetic impacts, power line agriculture impacts, power line environmental impacts, power line health impacts, power line livestock impacts, power line property value impacts, power line safety impacts, public interest, Sherwood Park, Strathcona County, tar sands upgrader, underground power lines
Impacts of Overhead High Voltage Lines on Crops
• October 10, 2011 • Comments Off on Impacts of Overhead High Voltage Lines on CropsPosted in Agricultural Impacts, AltaLink, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Red Deer Area Transmission Development Project, underground power lines
Tags: AltaLink, Bury high voltage lines, bury power lines, negative power line impacts, power line agriculture impacts, power line electromagnetic fields, Red Deer Area Transmission Development Project, underground power lines
Heartland Power Line Not Needed
• October 8, 2011 • Comments Off on Heartland Power Line Not NeededPosted in Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Alison Redford, AltaLink, bury power lines, Burying High Voltage Lines, Electricity: Co-generation, Electricity: Coal-fired, EPCOR, Heartland Transmission Project, Iris Evans, Tar Sands Upgrader, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, Alberta's Industrial Heartland, Alison Redford, AltaLink, Bury high voltage lines, bury power lines, Coal-fired electricity, electricity cogeneration, EPCOR, Heartland Transmission Project, Iris Evans, Sherwood Park, tar sands upgrader, underground power lines
Premier-Designate Redford Speaks on Power Lines
• October 4, 2011 • Comments Off on Premier-Designate Redford Speaks on Power LinesPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alison Redford, AltaLink, Bill 50, Bruce Johnson, bury power lines, Burying High Voltage Lines, Compensation, Electricity Costs, Electricity: Co-generation, Electricity: Coal-fired, Electricity: Export, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, Safety Impacts, Socio-economic Impacts, Tar Sands Upgrader, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alison Redford, AltaLink, Bill 50, Bruce Johnson, Bury high voltage lines, bury power lines, Coal-fired electricity, Edmonton Greenbelt, electricity cogeneration, electricity costs, electricity export, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line compensation, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, Sherwood Park Greenbelt, Strathcona County, tar sands upgrader, underground power lines
Thank You Gary Mar
• October 3, 2011 • Comments Off on Thank You Gary MarPosted in Alberta Government, Alberta P.C. Party, Alison Redford, bury power lines, Burying High Voltage Lines, Doug Horner, Gary Mar, underground power lines
Tags: Alberta Government, Alberta PC Party, Alison Redford, Bury high voltage lines, bury power lines, Doug Horner, Gary Mar, underground power lines
The Latest from Gary Mar on Power Lines
• September 30, 2011 • Comments Off on The Latest from Gary Mar on Power LinesPosted in Alberta Electric System Operator, Alberta P.C. Party, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Electricity: Generation, Gary Mar, underground power lines
Tags: Alberta Electric System Operator, Alberta PC Party, Alberta Utilities Commission, Bury high voltage lines, bury power lines, electricity generation, Gary Mar, underground power lines
Support Gary Mar for Premier
• September 29, 2011 • Comments Off on Support Gary Mar for PremierPosted in Alberta P.C. Party, Alberta Utilities Commission, Bill 50, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Gary Mar, Property Value Impacts, Rick Orman, underground power lines
Tags: Alberta PC Party, Alberta Utilities Commission, Bill 50, Bury high voltage lines, bury power lines, Colchester Elementary School, Gary Mar, power line property value impacts, Rick Orman, underground power lines
P.C. Leadership Candidates – Power Lines
• September 28, 2011 • Comments Off on P.C. Leadership Candidates – Power LinesPosted in Alberta Electric System Operator, Alberta Government, Alberta P.C. Party, Alberta Utilities Commission, Alison Redford, Bill 50, bury power lines, Burying High Voltage Lines, Doug Horner, Eastern Alberta Transmission Line, Electricity Costs, Electricity: Generation, Gary Mar, Heartland Transmission Project, Property Value Impacts, Proximity, underground power lines, Western Alberta Transmission Line
Tags: Alberta Electric System Operator, Alberta Government, Alberta PC Party, Alberta Utilities Commission, Alison Redford, Bill 50, Bury high voltage lines, bury power lines, Doug Horner, Eastern Alberta Transmission Line, electricity costs, electricity generation, Gary Mar, Heartland Transmission Project, power line property value impacts, underground power lines, Western Alberta Transmission Line
Line Buried to Protect People
• September 27, 2011 • Comments Off on Line Buried to Protect PeoplePosted in bury power lines, Burying High Voltage Lines, Ergon Energy, Proximity, underground power lines
Tags: Bury high voltage lines, bury power lines, Ergon Energy, underground power lines
World-wide Battle Against Overhead Power Lines
• September 19, 2011 • Comments Off on World-wide Battle Against Overhead Power LinesPosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, California, Chino Hills, Compensation, Electricity: Generation, Electromagnetic Fields, Environmental Impacts, Health Impacts, Hope For The Hills, Property Value Impacts, Proximity, Safety Impacts, Socio-economic Impacts, Southern California Edison, underground power lines
Tags: Bury high voltage lines, bury power lines, California Public Utilities Commission, Chino Hills, electricity generation, Hope For The Hills, lawsuit against Southern California Edison, negative power line impacts, power line aesthetic impacts, power line compensation, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, Southern California Edison, underground power lines
Thank You Rick Orman
• September 18, 2011 • Comments Off on Thank You Rick OrmanPosted in Alberta P.C. Party, bury power lines, Burying High Voltage Lines, Proximity, Rick Orman, underground power lines
Tags: Alberta PC Party, Bury high voltage lines, bury power lines, Rick Orman, underground power lines
This Candidate Would Bury the Power Line
• September 16, 2011 • Comments Off on This Candidate Would Bury the Power LinePosted in Alberta P.C. Party, Alison Redford, bury power lines, Burying High Voltage Lines, Doug Griffiths, Doug Horner, Gary Mar, Heartland Transmission Project, Proximity, Rick Orman, Ted Morton, underground power lines
Tags: Alberta PC Party, Alison Redford, Bury high voltage lines, bury power lines, Doug Griffiths, Doug Horner, Gary Mar, Heartland Transmission Project, Rick Orman, Ted Morton, underground power lines
Vote to Bury High Voltage Power Lines
• September 15, 2011 • Comments Off on Vote to Bury High Voltage Power LinesPosted in Alberta P.C. Party, bury power lines, Burying High Voltage Lines, Rick Orman, underground power lines
Tags: Alberta PC Party, Bury high voltage lines, bury power lines, Rick Orman, underground power lines
Rick Orman for Premier
• September 13, 2011 • Comments Off on Rick Orman for PremierPosted in Alberta Government, Alberta P.C. Party, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, Proximity, Rick Orman, underground power lines
Tags: Alberta Government, Alberta PC Party, Bury high voltage lines, bury power lines, Heartland Transmission Project, Rick Orman, Sherwood Park Hospital, underground power lines
Electricity Transmission Report Card
• September 12, 2011 • Comments Off on Electricity Transmission Report CardPosted in Aesthetic Impacts, Alberta P.C. Party, Alison Redford, Bill 19, Bill 36, Bill 50, bury power lines, Burying High Voltage Lines, Doug Griffiths, Doug Horner, Environmental Impacts, Gary Mar, Health Impacts, Heartland Transmission Project, Property Value Impacts, Rick Orman, Safety Impacts, Ted Morton, underground power lines
Tags: Alberta PC Party, Alison Redford, Bill 19, Bill 36, Bill 50, Bury high voltage lines, bury power lines, Doug Griffiths, Doug Horner, Gary Mar, Heartland Transmission Project, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, Rick Orman, Ted Morton, underground power lines
Repeal Bill 50 Says New Alberta Liberal Leader
• September 11, 2011 • Comments Off on Repeal Bill 50 Says New Alberta Liberal LeaderPosted in Alberta Electric System Operator, Alberta Government, Alberta Liberal Party, Bill 50, bury power lines, Burying High Voltage Lines, Health Impacts, Heartland Transmission Project, Kent Hehr, Raj Sherman, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Liberal Party, Bill 50, Bury high voltage lines, bury power lines, Heartland Transmission Project, Kent Hehr, power line health impacts, Raj Sherman, repeal Bill 50, underground power lines
Vote to Bury the Heartland Power Line
• September 9, 2011 • Comments Off on Vote to Bury the Heartland Power LinePosted in Alberta Government, Alberta P.C. Party, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, Proximity, Rick Orman, underground power lines
Tags: Alberta Government, Alberta PC Party, AltaLink, Bury high voltage lines, bury power lines, Edmonton Greenbelt, EPCOR, Heartland Transmission Project, negative power line impacts, Rick Orman, Sherwood Park Greenbelt, underground power lines
P.C. Leadership Candidates’ Views – Power Lines
• September 7, 2011 • Comments Off on P.C. Leadership Candidates’ Views – Power LinesPosted in Alberta P.C. Party, Alison Redford, Bill 50, bury power lines, Burying High Voltage Lines, Doug Griffiths, Doug Horner, Gary Mar, Heartland Transmission Project, Linda Osinchuk, Proximity, Rick Orman, Strathcona County, Ted Morton, underground power lines
Tags: Alberta PC Party, Alison Redford, Bill 50, Bury high voltage lines, bury power lines, Doug Griffiths, Doug Horner, Gary Mar, Heartland Transmission Project, Linda Osinchuk, negative power line impacts, repeal Bill 50, Rick Orman, Strathcona County, Ted Morton, underground power lines
Opposition to ATC 345kV Line Grows
• August 31, 2011 • Comments Off on Opposition to ATC 345kV Line GrowsPosted in American Transmission Company, Badger Coulee Transmission Line, bury power lines, Burying High Voltage Lines, Development Impacts, Environmental Impacts, Livestock Impacts, Property Value Impacts, Save Our Unique Lands (SOUL), Socio-economic Impacts, underground power lines
Tags: American Transmission Company, ATC, Badger Coulee Transmission Line, Bury high voltage lines, bury power lines, negative power line impacts, power line development impacts, power line environmental impacts, power line livestock impacts, power line property value impacts, power line socio-economic impacts, Save Our Unique Lands, SOUL, underground power lines
More Concerns by Candidates about Heartland Line
• August 30, 2011 • Comments Off on More Concerns by Candidates about Heartland LinePosted in Alberta P.C. Party, Alberta Wildrose Party, AltaLink, bury power lines, Burying High Voltage Lines, Dave Quest, EPCOR, Gary Mar, Heartland Transmission Project, Linda Osinchuk, Paul Nemetchek, Rick Orman, Strathcona County, underground power lines
Tags: Alberta PC Party, Alberta Wildrose Party, AltaLink, Bury high voltage lines, bury power lines, Dave Quest, EPCOR, Gary Mar, Heartland Transmission Project, Linda Osinchuk, Paul Nemetchek, Rick Orman, Sherwood Park Greenbelt, Strathcona County, Strathcona-Sherwood Park constituency, underground power lines
The Perfect Case for Burying Power Lines
• August 30, 2011 • Comments Off on The Perfect Case for Burying Power LinesPosted in bury power lines, Burying High Voltage Lines, Hurricane, Safety Impacts, Socio-economic Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, hurricane impacts on power lines, Hurricane Irene, power line safety impacts, power line socio-economic impacts, underground power lines
Rick Orman Listens to Power Line Concerns
• August 26, 2011 • Comments Off on Rick Orman Listens to Power Line ConcernsPosted in Alberta P.C. Party, Bruce Johnson, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, Linda Osinchuk, Rick Orman, Strathcona County, underground power lines
Tags: Alberta PC Party, Bruce Johnson, Bury high voltage lines, bury power lines, Heartland Transmission Project, Linda Osinchuk, negative power line impacts, Rick Orman, Strathcona County, underground power lines
Rick Orman Says Bury the Line
• August 25, 2011 • Comments Off on Rick Orman Says Bury the LinePosted in Aesthetic Impacts, Alberta P.C. Party, Bruce Johnson, bury power lines, Burying High Voltage Lines, Environmental Impacts, Health Impacts, Heartland Transmission Project, Linda Osinchuk, Property Value Impacts, Rick Orman, Safety Impacts, Strathcona County, underground power lines
Tags: Alberta PC Party, Bruce Johnson, Bury high voltage lines, bury power lines, Heartland Transmission Project, Linda Osinchuk, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, Rick Orman, Strathcona County, underground power lines
Bird Deaths – High Voltage Power Lines
• August 23, 2011 • Comments Off on Bird Deaths – High Voltage Power LinesPosted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, Bird Deaths, bury power lines, Burying High Voltage Lines, Environmental Impacts, Erin Bayne, Fact Sheets (RETA), Heartland Transmission Project, John Kristensen, Strathcona County, underground power lines, Visual Impacts
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Erin Bayne, Heartland Transmission Project, John Kristensen, power line aesthetic impacts, power line bird deaths, power line environmental impacts, power line visual impacts, RETA Fact Sheets, Strathcona County, underground power lines
Dave Conroy – Bury Power Line
• August 16, 2011 • Comments Off on Dave Conroy – Bury Power LinePosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Dave Conroy, Electromagnetic Fields, Health Impacts, Heartland Transmission Project, Property Value Impacts, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, Dave Conroy, Heartland Transmission Project, power line electromagnetic fields, power line health impacts, power line property value impacts, Sherwood Park, Sherwood Park Hospital, Strathcona County, underground power lines
Heartland Power Line Decision Coming
• August 11, 2011 • Comments Off on Heartland Power Line Decision ComingPosted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Electricity: Coal-fired, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Safety Impacts, underground power lines
Tags: Alberta Utilities Commission, Alberta's Industrial Heartland, AltaLink, Bury high voltage lines, bury power lines, Coal-fired electricity, Edmonton Greenbelt, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, Sherwood Park Greenbelt, underground power lines
Solar Storms and Overhead Power Lines
• August 9, 2011 • Comments Off on Solar Storms and Overhead Power LinesPosted in bury power lines, Burying High Voltage Lines, Hydro-Quebec, Solar Storm, underground power lines
Tags: Bury high voltage lines, bury power lines, Hydro-Quebec, solar storm impacts on power lines, underground power lines
Negative Health Effects of EMFs Proven
• August 4, 2011 • Comments Off on Negative Health Effects of EMFs ProvenPosted in Alberta Electric System Operator, Alberta Government, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Fact Sheets (RETA), Health Canada, Health Impacts, underground power lines, World Health Organization
Tags: Alberta Electric System Operator, Alberta Government, Bury high voltage lines, bury power lines, Health Canada, power line electromagnetic fields, power line health impacts, underground power lines, World Health Organization
Tornadoes Topple High Voltage Towers
• July 30, 2011 • Comments Off on Tornadoes Topple High Voltage TowersPosted in Alberta Electric System Operator, Alberta Government, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Fact Sheets (RETA), Heartland Transmission Project, Power outages, Safety Impacts, Tornado, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, power line safety impacts, power outages, tornado impacts on power lines, underground power lines
High Voltage Lines and Helicopters
• July 26, 2011 • Comments Off on High Voltage Lines and HelicoptersPosted in Aircraft Impacts, bury power lines, Burying High Voltage Lines, helicopter crashes, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, helicopter crash, power line aircraft impacts, power line safety impacts, underground power lines
RETA Submits Heartland Reply Argument
• July 11, 2011 • Comments Off on RETA Submits Heartland Reply ArgumentPosted in Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, public interest, underground power lines
Why Would MLA Dave Quest Support Doug Horner?
• July 11, 2011 • Comments Off on Why Would MLA Dave Quest Support Doug Horner?Posted in Alberta Government, Alberta P.C. Party, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Dave Quest, Doug Horner, EPCOR, Gene Zwozdesky, Heartland Transmission Project, Iris Evans, Jeff Johnson, Naresh Bhardwaj, Peter Sandhu, Tony Vandermeer, underground power lines
Tags: Alberta Government, Alberta PC Party, AltaLink, Bill 50, Bury high voltage lines, bury power lines, Colchester Elementary School, Dave Quest, Doug Horner, EPCOR, Gene Zwozdesky, Heartland Transmission Project, Iris Evans, Jeff Johnson, Naresh Bhardwaj, Peter Sandhu, repeal Bill 50, Tony Vandermeer, underground power lines
Heartland Power Line Hearing – Final Arguments
• June 23, 2011 • Comments Off on Heartland Power Line Hearing – Final ArgumentsPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bird Deaths, bury power lines, Burying High Voltage Lines, Compensation, Electricity: Co-generation, Electricity: Coal-fired, Electromagnetic Fields, Environmental Impacts, EPCOR, Heartland Transmission Project, Intimidation, Noise Impacts, Pipeline Impacts, Property Value Impacts, Public Consultation, Safety Impacts, Tar Sands Upgrader, Tourism Impacts, underground power lines, Visual Impacts
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Coal-fired electricity, electricity cogeneration, EPCOR, Heartland Transmission Project, landowner intimidation, negative power line impacts, power line aesthetic impacts, power line bird deaths, power line compensation, power line electromagnetic fields, power line environmental impacts, power line noise impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line tourism impacts, power line visual impacts, public consultation, tar sands upgrader, underground power lines
Electromagnetic Field Impacts on Crops
• June 21, 2011 • Comments Off on Electromagnetic Field Impacts on CropsPosted in Aesthetic Impacts, Agricultural Impacts, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, Forestry Impacts, Health Impacts, Property Value Impacts, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, EMF impacts on crops, negative power line impacts, power line aesthetic impacts, power line agriculture impacts, power line economic losses, power line electromagnetic fields, power line environmental impacts, power line forestry impacts, power line health impacts, power line property value impacts, power line safety impacts, underground power lines
AUC Heartland Hearing – Day 24
• May 17, 2011 • Comments Off on AUC Heartland Hearing – Day 24Posted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Industrial Heartland Assoc, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Development Impacts, Don Rigney, Edmonton (City of), Electricity: Co-generation, Electricity: Coal-fired, Electricity: Gas-fired, Electromagnetic Fields, Environmental Impacts, Health Impacts, Heartland Transmission Project, Karen Leibovici, Parkland County, Property Value Impacts, Public Opinion Survey, Rod Shaigec, Spruce Grove (City of), Sturgeon County, Tar Sands Upgrader, underground power lines
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, Alberta Industrial Heartland Association, Alberta Utilities Commission, Alberta's Industrial Heartland, Angus Reid Poll, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, City of Edmonton, Coal-fired electricity, Don Rigney, Edmonton Greenbelt, electricity cogeneration, Heartland Transmission Project, Karen Leibovici, natural gas-fired electricity, Parkland County, power line development impacts, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line property value impacts, power line visual impacts, public interest, public opinion survey, Restricted Development Area, Rod Shaigec, Spruce Grove, Sturgeon County, tar sands upgrader, underground power lines, Wagner Natural Area
AUC Heartland Hearing – Day 23
• May 13, 2011 • Comments Off on AUC Heartland Hearing – Day 23Posted in Alberta Electric System Operator, Alberta Food Processors Assoc, Alberta Government, Alberta Utilities Commission, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Electricity Costs, Health Impacts, Heartland Transmission Project, Industrial Power Consumer's Assoc AB, Proximity, Radio Interference, SNC-Lavalin, Socio-economic Impacts, Sturgeon County, underground power lines
Tags: Alberta Electric System Operator, Alberta Food Processors Association, Alberta Government, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bill 50, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, Department of National Defence, Heartland Transmission Project, high electricity costs, Industrial Power Consumers Association of Alberta, power line health impacts, power line radio interference, power line socio-economic impacts, SNC-Lavalin, Strathcona County, Sturgeon County, underground power lines
AUC Heartland Hearing – Day 22
• May 13, 2011 • Comments Off on AUC Heartland Hearing – Day 22Posted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Utilities Commission, AltaLink, Bird Deaths, bury power lines, Burying High Voltage Lines, Cable Consulting International, Corona Effect, Electromagnetic Fields, Environmental Impacts, EPCOR, Erin Bayne, Health Impacts, Heartland Transmission Project, Linda Osinchuk, Martin Blank, Pipeline Impacts, Proximity, Public Consultation, Strathcona County, underground power lines, World Health Organization, XLPE Cable
Tags: Alberta Electric System Operator, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Cable Consulting International, corona effect, EPCOR, Erin Bayne, Heartland Transmission Project, International Commission on Non-ionizing Radiation Protection, landowner intimidation, Linda Osinchuk, Martin Blank, power line Alzheimer's disease risk, power line bird deaths, power line cancer risks, power line DNA damage, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line leukemia risks, power line pipeline impacts, power line visual impacts, power line wildlife impacts, public consultation, Sherwood Park Greenbelt, Strathcona County, underground power lines, World Health Organization, XLPE cable
AUC Heartland Hearing – Day 21
• May 12, 2011 • Comments Off on AUC Heartland Hearing – Day 21Posted in A & D Daycare, Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bill 50, Bird Deaths, Brian Gettel, bury power lines, Burying High Voltage Lines, Cable Consulting International, Environmental Impacts, EPCOR, Europacable, FDI Acoustics Inc., Gibbons Landowners Group, Health Impacts, Heartland Transmission Project, John Kristensen, Livestock Impacts, Noise Impacts, Property Value Impacts, Proximity, Public Consultation, Riparia Ltd., Safety Impacts, Socio-economic Impacts, Sturgeon County, Sturgeon Landowners Group, underground power lines
Tags: A & D Daycare, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bill 50, Brian Gettel, Bury high voltage lines, bury power lines, Cable Consulting International, Colleen Boddez, EPCOR, Europacable, FDI Acoustics Inc., Gibbons Landowners Group, Heartland Transmission Project, John Kristensen, power line bird deaths, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line livestock impacts, power line noise impacts, power line property value impacts, power line safety impacts, power line socio-economic impacts, power line visual impacts, public consultation, Riparia Ltd., sensitive wildlife species, Sherwood Park, Sherwood Park Greenbelt, Sturgeon County, Sturgeon Landowners Group, threatened wildlife species, Truescape, underground power lines, visual impact assessment
AUC Heartland Hearing – Day 20
• May 11, 2011 • Comments Off on AUC Heartland Hearing – Day 20Posted in Aesthetic Impacts, Agricultural Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Livestock Impacts, Noise Impacts, Property Value Impacts, Public Consultation, Socio-economic Impacts, Stray Voltage, Sturgeon Landowners Group, Tourism Impacts, underground power lines
Tags: Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, environmental impact assessment, EPCOR, Heartland Transmission Project, power line agriculture impacts, power line compensation, power line health impacts, power line livestock impacts, power line noise impacts, power line property value impacts, power line socio-economic impacts, power line tourism impacts, public consultation, stray voltage, Sturgeon Landowners Group, underground power lines, visual impact assessment
AUC Heartland Hearing – Day 18
• May 7, 2011 • Comments Off on AUC Heartland Hearing – Day 18Posted in Aesthetic Impacts, Agricultural Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Compensation, Doug Horner, Electricity: Export, Environmental Impacts, Health Impacts, Heartland Transmission Project, Noise Impacts, Property Value Impacts, Public Consultation, Safety Impacts, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Doug Horner, electricity export, Heartland Transmission Project, power line agriculture impacts, power line compensation, power line environmental impacts, power line health impacts, power line noise impacts, power line property value impacts, power line safety impacts, power line visual impacts, public consultation, underground power lines
AUC Heartland Hearing – Day 17
• May 6, 2011 • Comments Off on AUC Heartland Hearing – Day 17Posted in Aesthetic Impacts, Alberta Utilities Commission, Bruce Johnson, bury power lines, Burying High Voltage Lines, Electromagnetic Fields, Environmental Impacts, Health Impacts, Heartland Transmission Project, Pipeline Impacts, Property Value Impacts, Proximity, Public Consultation, Safety Impacts, Sturgeon Landowners Group, underground power lines
Tags: Alberta Utilities Commission, AUC Heartland hearing proceedings, Bruce Johnson, Bury high voltage lines, bury power lines, Heartland Transmission Project, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, power line stress impacts, power line visual impacts, public consultation, Sherwood Park Greenbelt, Sturgeon Landowners Group, underground power lines
AUC Heartland Hearing – Day 16
• May 4, 2011 • Comments Off on AUC Heartland Hearing – Day 16Posted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Compensation, Electricity: Co-generation, Electricity: Coal-fired, Electromagnetic Fields, Environmental Impacts, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, TransAlta, underground power lines, William Bailey
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, Alberta Utilities Commission, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Coal-fired electricity, Colchester Elementary School, electricity cogeneration, ERCB, Heartland Transmission Project, power line aesthetic impacts, power line compensation, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line property value impacts, power line visual impacts, Sherwood Park Greenbelt, Transalta, underground power lines, William Bailey
AUC Heartland Hearing – Day 15
• May 4, 2011 • Comments Off on AUC Heartland Hearing – Day 15Posted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Compensation, Environmental Impacts, Heartland Transmission Project, Homeowners Against Lines Overhead, Industrial Power Consumer's Assoc AB, Pipeline Impacts, Property Value Impacts, Proximity, Public Consultation, underground power lines
Tags: Alberta Infrastructure, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Darin Watson, Heartland Transmission Project, Homeowners Against Lines Overhead, Industrial Power Consumers Association of Alberta, landowner intimidation, lattice transmission towers, monopole transmission towers, power line aesthetic impacts, power line compensation, power line environmental impacts, power line pipeline impacts, power line property value impacts, public consultation, Sherwood Park Greenbelt, underground power lines
AUC Heartland Hearing – Day 12
• April 29, 2011 • Comments Off on AUC Heartland Hearing – Day 12Posted in Aesthetic Impacts, Aircraft Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bird Deaths, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Edmonton (City of), Environmental Impacts, Health Impacts, Heartland Transmission Project, Industrial Power Consumer's Assoc AB, Property Value Impacts, Proximity, Safety Impacts, Sherwood Park Fish & Game Assoc, Spruce Grove (City of), Tornado, underground power lines, Visual Impacts
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, City of Edmonton, Colchester Elementary School, Heartland Transmission Project, Industrial Power Consumers Association of Alberta, monopole transmission towers, power line aesthetic impacts, power line aircraft impacts, power line bird deaths, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, power line visual impacts, Restricted Development Area, Sherwood Park Fish and Game Association, Spruce Grove, tornado impacts on power lines, underground power lines
AUC Heartland Hearing – Day 8
• April 21, 2011 • Comments Off on AUC Heartland Hearing – Day 8Posted in Aesthetic Impacts, Alberta Government, Alberta Utilities Commission, AltaLink, Bill Yurko, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Compensation, Electromagnetic Fields, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Pipeline Impacts, Property Value Impacts, Proximity, Public Consultation, Safety Impacts, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bill Yurko, Bury high voltage lines, bury power lines, Colchester Elementary School, Edmonton Greenbelt, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line compensation, power line electromagnetic fields, power line environmental impacts, power line health impacts, power line pipeline impacts, power line property value impacts, power line safety impacts, public consultation, Sherwood Park, Sherwood Park Greenbelt, Strathcona County, Transportation Utility Corridor, underground power lines, Westboro School
Attend Sherwood Park AUC Hearing
• April 18, 2011 • Comments Off on Attend Sherwood Park AUC HearingPosted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Cartoon, Heartland Transmission Project, underground power lines
Tags: Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Darin Watson, Heartland Transmission Project, power line aesthetic impacts, Sherwood Park, underground power lines
AUC Heartland Hearing – Day 6
• April 18, 2011 • Comments Off on AUC Heartland Hearing – Day 6Posted in A & D Daycare, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Health Impacts, Heartland Transmission Project, Proximity, Public Consultation, Radio Interference, Socio-economic Impacts, Strathcona County, underground power lines
Tags: A & D Daycare, Alberta Electric System Operator, Alberta Government, Alberta Infrastructure, Alberta Utilities Commission, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester School closing, Department of National Defence, Edmonton Greenbelt, Heartland Transmission Project, power line health impacts, power line radio interference, power line socio-economic impacts, public consultation, Restricted Development Area, Sherwood Park Greenbelt, Strathcona County, Transportation Utility Corridor, underground power lines
AUC Heartland Hearing – Day 5
• April 16, 2011 • Comments Off on AUC Heartland Hearing – Day 5Posted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Cartoon, Darin Watson, Electromagnetic Fields, EPCOR, Health Canada, Health Impacts, Heartland Transmission Project, Public Consultation, underground power lines
Tags: Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, Canadian Cancer Society, Darin Watson, EPCOR, Health Canada, Heartland Transmission Project, power line aesthetic impacts, power line electromagnetic fields, power line health impacts, power line stress impacts, power line visual impacts, public consultation, Truescape, underground power lines
AUC Heartland Hearing – Day 4
• April 14, 2011 • Comments Off on AUC Heartland Hearing – Day 4Posted in Aesthetic Impacts, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Compensation, EPCOR, Heartland Transmission Project, Noise Impacts, Pipeline Impacts, Property Value Impacts, Proximity, underground power lines
Tags: Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line compensation, power line noise impacts, power line pipeline impacts, power line property value impacts, power line visual impacts, underground power lines, visual impact assessment, visualization
AUC Heartland Hearing – Day 3
• April 14, 2011 • Comments Off on AUC Heartland Hearing – Day 3Posted in Aesthetic Impacts, Alberta Government, Alberta Utilities Commission, AltaLink, Bill 50, bury power lines, Burying High Voltage Lines, Darin Watson, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, Public Consultation, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, AUC Heartland hearing proceedings, Bill 50, Bury high voltage lines, bury power lines, Darin Watson, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line stress impacts, public consultation, underground power lines
AUC Heartland Transmission Line Hearing
• April 11, 2011 • Comments Off on AUC Heartland Transmission Line HearingPosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, Heartland Transmission Project, underground power lines
The Real Cost
• April 9, 2011 • Comments Off on The Real CostPosted in AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, underground power lines
Tags: AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, underground power lines
Edmonton Wants Heartland Line Buried
• April 8, 2011 • Comments Off on Edmonton Wants Heartland Line BuriedPosted in Aesthetic Impacts, Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Development Impacts, Edmonton (City of), Environmental Impacts, Health Impacts, Heartland Transmission Project, Noise Impacts, Property Value Impacts, Strathcona County, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, City of Edmonton, Heartland Transmission Project, power line aesthetic impacts, power line development impacts, power line environmental impacts, power line health impacts, power line noise impacts, power line property value impacts, Strathcona County, underground power lines
It’s Time for the Truth about Electricity
• March 30, 2011 • Comments Off on It’s Time for the Truth about ElectricityPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, AltaLink, ATCO Electric, Bruce Johnson, bury power lines, Burying High Voltage Lines, Electricity: Export, Environmental Impacts, EPCOR, Health Impacts, Property Value Impacts, Public Consultation, Safety Impacts, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, AltaLink, ATCO Electric, Bruce Johnson, Bury high voltage lines, bury power lines, electricity export, EPCOR, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, public consultation, underground power lines
Successful Bury The Line Public Rally
• March 20, 2011 • Comments Off on Successful Bury The Line Public RallyPosted in Aesthetic Impacts, Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta P.C. Party, Alberta Party, Alberta Wildrose Party, Bill 50, Brian Mason, Bruce Johnson, bury power lines, Burying High Voltage Lines, Cheryl Przybilla, Colchester Elementary School, Dave Quest, Environmental Impacts, Health Impacts, John Kristensen, Kent Hehr, Kevin Melnyk, Laurie Blakeman, Linda Duncan, Linda Osinchuk, Naresh Bhardwaj, Property Value Impacts, Proximity, Safety Impacts, Shannon Stubbs, Sue Huff, underground power lines
Tags: Alberta Government, Alberta Liberal Party, Alberta NDP, Alberta Party, Alberta PC Party, Alberta Wildrose Party, Bill 50, Brian Mason, Bruce Johnson, Bury high voltage lines, bury power lines, Cheryl Przybilla, Colchester Elementary School, Dave Quest, Heartland power line rally, John Kristensen, Kent Hehr, Kevin Melnyk, Laurie Blakeman, Linda Duncan, Linda Osinchuk, Naresh Bhardwaj, power line aesthetic impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, Shannon Stubbs, Sue Huff, underground power lines
Bury The Line Rally – Details
• March 18, 2011 • Comments Off on Bury The Line Rally – DetailsPosted in Brian Mason, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Dave Quest, Kent Hehr, Linda Duncan, Linda Osinchuk, Sue Huff, underground power lines
Tags: Brian Mason, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester Parents' Association, Dave Quest, Heartland power line rally, Heartland Transmission Project, Kent Hehr, Linda Duncan, Linda Osinchuk, Sue Huff, underground power lines
Bury The Line Rally Media Advisory
• March 14, 2011 • Comments Off on Bury The Line Rally Media AdvisoryPosted in Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, ATCO Electric, bury power lines, Burying High Voltage Lines, EPCOR, underground power lines
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, ATCO Electric, Bury high voltage lines, bury power lines, EPCOR, Heartland power line rally, Heartland Transmission Project, underground power lines
Big Bury the Line Public Rally
• March 3, 2011 • Comments Off on Big Bury the Line Public RallyPosted in bury power lines, Burying High Voltage Lines, Proximity, underground power lines
Tags: Bury high voltage lines, bury power lines, Heartland power line rally, Heartland Transmission Project, underground power lines
Strathcona Responds to Residents
• February 24, 2011 • Comments Off on Strathcona Responds to ResidentsPosted in bury power lines, Burying High Voltage Lines, Proximity, Strathcona County, underground power lines
Tags: Bury high voltage lines, bury power lines, public interest, Sherwood Park Greenbelt, Strathcona County, underground power lines
Burying High Voltage Power Lines
• February 19, 2011 • Comments Off on Burying High Voltage Power LinesPosted in bury power lines, Burying High Voltage Lines, Cheryl Przybilla, Colchester Elementary School, David MacLean, Health Impacts, John Kristensen, underground power lines
Tags: Bury high voltage lines, bury power lines, Cheryl Przybilla, Colchester Elementary School, David MacLean, John Kristensen, power line health impacts, underground power lines
SNC-Lavalin Owns All of AltaLink
• February 14, 2011 • Comments Off on SNC-Lavalin Owns All of AltaLinkPosted in AltaLink, bury power lines, Burying High Voltage Lines, Moammar Gadhafi, Proximity, SNC-Lavalin, underground power lines
Tags: AltaLink, Bury high voltage lines, bury power lines, Moammar Gadhafi, SNC-Lavalin, underground power lines
Many Groups Fight Power Lines
• February 13, 2011 • Comments Off on Many Groups Fight Power LinesPosted in bury power lines, Burying High Voltage Lines, Environmental Impacts, Health Impacts, Power Line Truth.org, Property Value Impacts, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, negative power line impacts, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, Power Line Truth.org, underground power lines
RETA Asks MLAs Power Line Questions
• February 2, 2011 • Comments Off on RETA Asks MLAs Power Line QuestionsPosted in Alberta Government, Alberta Liberal Party, Alberta P.C. Party, AltaLink, ATCO Electric, Bill 50, bury power lines, Burying High Voltage Lines, Eastern Alberta Transmission Line, Heartland Transmission Project, Public Opinion Survey, underground power lines, Western Alberta Transmission Line
Tags: Alberta Government, Alberta Liberal Party, Alberta PC Party, AltaLink, ATCO Electric, Bill 50, Bury high voltage lines, bury power lines, Eastern Alberta Transmission Line, Heartland Transmission Project, public opinion survey, underground power lines, Western Alberta Transmission Line
Heartland Power Line Would Close School
• January 20, 2011 • Comments Off on Heartland Power Line Would Close SchoolPosted in Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Corona Effect, Electromagnetic Fields, EPCOR, Health Impacts, Heartland Transmission Project, Safety Impacts, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, Colchester Elementary School, Colchester Parents' Association, Colchester School closing, EPCOR, Heartland Transmission Project, power line corona effect, power line electromagnetic fields, power line health impacts, power line safety impacts, underground power lines
Strathcona Continues Power Line Fight
• January 11, 2011 • Comments Off on Strathcona Continues Power Line FightPosted in Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, Petition, Strathcona County, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, power line petition, Strathcona County, underground power lines
Another 500kV Power Line Route Selected
• December 9, 2010 • Comments Off on Another 500kV Power Line Route SelectedPosted in Alberta Electric System Operator, Alberta Government, AltaLink, bury power lines, Burying High Voltage Lines, Compensation, Electricity: Coal-fired, Electricity: Generation, Enmax, Heartland Transmission Project, underground power lines, Western Alberta Transmission Line
Tags: Alberta Electric System Operator, Alberta Government, AltaLink, Bury high voltage lines, bury power lines, Coal-fired electricity, electricity generation, ENMAX, Heartland Transmission Project, power line compensation, underground power lines, Western Alberta Transmission Line
Premier to Speak about Heartland Line
• December 5, 2010 • Comments Off on Premier to Speak about Heartland LinePosted in Alberta Government, bury power lines, Burying High Voltage Lines, Ed Stelmach, Heartland Transmission Project, Sherwood Park Chamber Commerce, underground power lines
Tags: Alberta Government, Bury high voltage lines, bury power lines, Ed Stelmach, Heartland Transmission Project, Sherwood Park Chamber of Commerce, underground power lines
Meeting on “Transmission Lines and Landowner Rights”
• November 26, 2010 • Comments Off on Meeting on “Transmission Lines and Landowner Rights”Posted in Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, ATCO Electric, Bill 19, Bill 36, Bill 50, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, Property Rights, underground power lines
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, ATCO Electric, Bill 19, Bill 36, Bill 50, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, Joe Anglin, Keith Wilson, property rights, underground power lines
Several Arguments Needed to Fight Lines
• November 12, 2010 • Comments Off on Several Arguments Needed to Fight LinesPosted in Aesthetic Impacts, Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, bury power lines, Burying High Voltage Lines, Compensation, Environmental Impacts, EPCOR, Health Impacts, Heartland Transmission Project, Property Value Impacts, Proximity, Safety Impacts, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, Alberta Utilities Commission, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, power line aesthetic impacts, power line compensation, power line environmental impacts, power line health impacts, power line property value impacts, power line safety impacts, underground power lines
Petition to Bury Heartland Line
• November 6, 2010 • Comments Off on Petition to Bury Heartland LinePosted in Alberta Government, bury power lines, Burying High Voltage Lines, Dave Quest, Heartland Transmission Project, Petition, Strathcona County, underground power lines
Tags: Alberta Government, Bury high voltage lines, bury power lines, Dave Quest, Heartland Transmission Project, power line petition, Strathcona County, underground power lines
AUC Heartland Process Hearing Summary
• November 4, 2010 • Comments Off on AUC Heartland Process Hearing SummaryPosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Edmonton (City of), Heartland Transmission Project, Proximity, Strathcona County, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, City of Edmonton, Heartland Transmission Project, Strathcona County, underground power lines
Vue Weekly Talks with RETA about Power Line Controversy
• September 13, 2010 • Comments Off on Vue Weekly Talks with RETA about Power Line ControversyPosted in Alberta Government, Bill 50, Bruce Johnson, bury power lines, Burying High Voltage Lines, Health Impacts, Property Value Impacts, Proximity, underground power lines
Tags: Alberta Government, Bill 50, Bruce Johnson, Bury high voltage lines, bury power lines, power line health impacts, power line property value impacts, underground power lines
Petition Information
• September 6, 2010 • Comments Off on Petition InformationPosted in bury power lines, Burying High Voltage Lines, Heartland Transmission Project, Petition, underground power lines
Tags: Bury high voltage lines, bury power lines, Heartland Transmission Project, power line petition, Sherwood Park, underground power lines
Bigger Must Be Better!
• August 3, 2010 • Comments Off on Bigger Must Be Better!Posted in Alberta Government, Alberta Utilities Commission, Bill 50, Bruce Brandell, Bruce Johnson, bury power lines, Burying High Voltage Lines, Ed Stelmach, EPCOR, FOIP, Health Impacts, Heartland Transmission Project, Property Value Impacts, Public Consultation, Tar Sands Upgrader, underground power lines
Tags: Alberta Government, Alberta Utilities Commission, Bill 50, Bruce Brandell, Bruce Johnson, Bury high voltage lines, bury power lines, Ed Stelmach, EPCOR, FOIP, Heartland Transmission Project, power line health impacts, power line property value impacts, public consultation, tar sands upgrading, underground power lines
Welcome To Your Future
• April 26, 2010 • Comments Off on Welcome To Your FuturePosted in Alberta Government, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, underground power lines, Youtube
Tags: Alberta Government, Bury high voltage lines, bury power lines, Heartland Transmission Project, negative power line impacts, RETA YouTube, underground power lines
A Need Indeed?
• April 20, 2010 • Comments Off on A Need Indeed?Posted in bury power lines, Burying High Voltage Lines, Heartland Transmission Project, Proximity, underground power lines
Tags: Bury high voltage lines, bury power lines, Heartland power line overbuild, Heartland Transmission Project, underground power lines
RETA Requests Premier to Re-Evaluate Need for Heartland Line
• April 5, 2010 • Comments Off on RETA Requests Premier to Re-Evaluate Need for Heartland LinePosted in Aesthetic Impacts, Alberta Government, bury power lines, Burying High Voltage Lines, Ed Stelmach, Health Canada, Heartland Transmission Project, Property Value Impacts, Proximity, Public Opinion Survey, Safety Impacts, Tar Sands Upgrader, underground power lines
Tags: Alberta Government, Alberta Royalty Framework, Bury high voltage lines, bury power lines, Ed Stelmach, Health Canada, Heartland Transmission Project, Leger Marketing, power line aesthetic impacts, power line property value impacts, power line safety impacts, public opinion survey, tar sands upgrader, underground power lines
Underground Study Results Made Public
• February 24, 2010 • Comments Off on Underground Study Results Made PublicPosted in Alberta Electric System Operator, bury power lines, Burying High Voltage Lines, Heartland Transmission Project, underground power lines
Tags: Alberta Electric System Operator, Bury high voltage lines, bury power lines, Heartland power line overbuild, Heartland Transmission Project, underground power lines
New Fact Sheets + Thanks for Your Patience
• February 10, 2010 • Comments Off on New Fact Sheets + Thanks for Your PatiencePosted in bury power lines, Burying High Voltage Lines, Corona Effect, Electric Shock, Fact Sheets (RETA), Health Impacts, Pipeline Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, high voltage power line facts, negative power line impacts, power line corona effect, power line electric shock, power line health impacts, power line pipeline impacts, underground power lines
Down To 2 Routes: Nothing Changes!
• January 11, 2010 • Comments Off on Down To 2 Routes: Nothing Changes!Posted in Alberta Electric System Operator, Alberta Government, AltaLink, bury power lines, Burying High Voltage Lines, Cartoon, EPCOR, Heartland Transmission Project, Proximity, underground power lines
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland Transmission Project, underground power lines
A Well Deserved Rest
• December 17, 2009 • Comments Off on A Well Deserved RestPosted in Brian Gettel, Bruce Johnson, bury power lines, Burying High Voltage Lines, Cartoon, Colchester Elementary School, Danny Hooper, Fred Ritter, Heartland Transmission Project, Magda Havas, Stephen Kane, underground power lines
Tags: Brian Gettel, Bruce Johnson, Bury high voltage lines, bury power lines, Colchester Elementary School, Danny Hooper, Fred Ritter, Heartland power line rally, Heartland Transmission Project, Magda Havas, Stephen Kane, underground power lines
Thank You!
• November 26, 2009 • Comments Off on Thank You!Posted in Alberta Electric System Operator, Alberta Government, AltaLink, Brian Gettel, bury power lines, Burying High Voltage Lines, Colchester Elementary School, Danny Hooper, Ed Stelmach, Fred Ritter, Heartland Transmission Project, Judy Weiss, Magda Havas, Proximity, Public Opinion Survey, Ron Liepert, Stephen Kane, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, AltaLink, Brian Gettel, Bury high voltage lines, bury power lines, Colchester Elementary School, Danny Hooper, Ed Stelmach, Fred Ritter, Heartland power line rally, Heartland Transmission Project, Judy Weiss, Magda Havas, public opinion survey, Ron Liepert, Stephen Kane, underground power lines
Nearly There…
• November 22, 2009 • Comments Off on Nearly There…Posted in Alberta Government, bury power lines, Burying High Voltage Lines, underground power lines
Tags: Alberta Government, Bury high voltage lines, bury power lines, Heartland power line rally, Heartland Transmission Project, underground power lines
The Cost of Progress
• November 7, 2009 • Comments Off on The Cost of ProgressPosted in Alberta Electric System Operator, Alberta Government, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Heartland Transmission Project, Public Opinion Survey, underground power lines
Tags: Alberta Electric System Operator, Alberta Energy, Alberta Government, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Heartland power line overbuild, Heartland Transmission Project, Leger Marketing, public opinion survey, underground power lines
Public Opinion Survey
• November 5, 2009 • Comments Off on Public Opinion SurveyPosted in Aesthetic Impacts, bury power lines, Burying High Voltage Lines, Health Impacts, Noise Impacts, Property Value Impacts, Proximity, Public Opinion Survey, Safety Impacts, underground power lines
Tags: Bury high voltage lines, bury power lines, Leger Marketing, power line aesthetic impacts, power line health impacts, power line noise impacts, power line property value impacts, power line safety impacts, power line visual impacts, public opinion survey, underground power lines
Mother of All Town Hall Meetings
• October 21, 2009 • Comments Off on Mother of All Town Hall MeetingsPosted in Alberta Electric System Operator, bury power lines, Burying High Voltage Lines, Coalition West End Communities for Burying the Line, Danny Hooper, Electromagnetic Fields, Heartland Transmission Project, Magda Havas, underground power lines
Tags: Alberta Electric System Operator, Bury high voltage lines, bury power lines, Coalition of West End Communities for Burying the Line, Danny Hooper, Heartland power line rally, Heartland Transmission Project, Magda Havas, power line electromagnetic fields, underground power lines
All For One and One For All!
• September 29, 2009 • Comments Off on All For One and One For All!Posted in Alberta Electric System Operator, Bruce Johnson, bury power lines, Burying High Voltage Lines, Coalition West End Communities for Burying the Line, Heartland Transmission Project, Proximity, underground power lines
Tags: Alberta Electric System Operator, Bruce Johnson, Bury high voltage lines, bury power lines, Coalition of West End Communities for Burying the Line, Heartland power line rally, Heartland Transmission Project, underground power lines
Strength in Unity – RETA and West TUC Group Merge
• September 28, 2009 • Comments Off on Strength in Unity – RETA and West TUC Group MergePosted in Bruce Johnson, bury power lines, Burying High Voltage Lines, Coalition West End Communities for Burying the Line, Heartland Transmission Project, June McNeil, Proximity, underground power lines
Tags: Bruce Johnson, Bury high voltage lines, bury power lines, Coalition of West End Communities for Burying the Line, Heartland Transmission Project, June McNeil, underground power lines
A Great Show of Support from West Edmonton
• September 23, 2009 • Comments Off on A Great Show of Support from West EdmontonPosted in bury power lines, Burying High Voltage Lines, Coalition West End Communities for Burying the Line, Heartland Transmission Project, underground power lines
Tags: Bury high voltage lines, bury power lines, Coalition of West End Communities for Burying the Line, Heartland power line rally, Heartland Transmission Project, underground power lines
A Sign of the Times
• September 7, 2009 • Comments Off on A Sign of the TimesPosted in bury power lines, Burying High Voltage Lines, Todd Oeming, underground power lines
Tags: Bury high voltage lines, bury power lines, power line environmental impacts, power line health impacts, power line safety impacts, Todd Oeming, underground power lines
Edmonton City Council Passes Motion Opposing Above Ground 500kV Lines
• September 2, 2009 • Comments Off on Edmonton City Council Passes Motion Opposing Above Ground 500kV LinesPosted in Alberta Utilities Commission, bury power lines, Burying High Voltage Lines, Edmonton (City of), Heartland Transmission Project, Proximity, underground power lines
Tags: Alberta Utilities Commission, Bury high voltage lines, bury power lines, City of Edmonton, Heartland Transmission Project, underground power lines
Great Turnout for Meeting on June 17th
• June 24, 2009 • Comments Off on Great Turnout for Meeting on June 17thPosted in Alberta Electric System Operator, AltaLink, bury power lines, Burying High Voltage Lines, Ed Stelmach, EPCOR, Europacable, Mel Knight, Proximity, underground power lines
Tags: Alberta Electric System Operator, Alberta Government, AltaLink, Bury high voltage lines, bury power lines, Ed Stelmach, EPCOR, Europacable, Heartland power line rally, Mel Knight, Strathcona County, underground power lines
Town Hall Meeting – June 17th, Coast Edmonton East Hotel
• May 30, 2009 • Comments Off on Town Hall Meeting – June 17th, Coast Edmonton East HotelPosted in Alberta Electric System Operator, AltaLink, bury power lines, Burying High Voltage Lines, EPCOR, Ernesto Zaccone, Europacable, Heartland Transmission Project, Thomas Neesen, underground power lines, Volker Wendt
Tags: Alberta Electric System Operator, AltaLink, Bury high voltage lines, bury power lines, EPCOR, Ernesto Zaccone, Europacable, Heartland power line rally, Heartland Transmission Project, Thomas Neesen, underground power lines, Volker Wendt